1
BUILDING MOVING PERMIT GUIDELINES & PROCEDURES
City of Conway, Arkansas - Planning & Development
1111 Main Street • Conway, AR • 72032 • 501-450-6105 • conwayarkansas.gov
Effective on and after November 26, 1994
General Information
A building moving permit is required in order to move any building other than a portable building in the City of Conway
from one place to another on the same lot, or from one lot to another.
A portable building may be granted a building permit by the City Permits Department if the following conditions are met:
A. The building is not designated for full-time occupancy and it has no sleeping quarters.
B. There are no installed electrical wiring, receptacles, or plumbing facilities.
C. The building is a pre-fabricated design, arriving as a fully assembled structure.
D. The building is no more than 160 square feet in area and not more than 16 feet in its greatest dimension.
Such a portable building shall be deemed an accessory building and will be subject to all appropriate requirements as set
forth in the zoning ordinance.
The Mayor and City Permits Department may grant a 90-day permit to locate a temporary portable building or portable
office building within the City of Conway. The provisions for applications do not apply to this 90-day permit, but application
must be made directly to the Mayor and City Permits Department for approval and issuance of permit.
Procedure
1. All applications for a building moving permit shall be made in writing to the Planning Commission in accordance with
the Planning Commission calendar (attached).
2. All applications shall contain the following information:
A. A description of the building to be moved.
B. The present location of the building.
C. The proposed location of the building.
D. The present and future use of the building.
E. The route over which the building is to be moved and the method of moving the building.
F. Photographs of the building or structure to be moved and photographs of the surrounding properties.
G. A report from a licensed structural pest control contractor stating the condition of the building or structure.
H. Any other information necessary to carry out the purposes of the Zoning Code.
3. The applicant must post a sign on the property to the which the building is to be moved, at or near the front property
line, clearly visible and unobstructed to the passing general public no less than 15 days prior to the public hearing.
The disposable sign may be obtained from the Planning & Development Department for $10.00 and must remain
posted on the property until the public hearing has taken place.
4. Th
e applicant must place a legal notice of public hearing in the Log Cabin Democrat or Arkansas Democrat-Gazette that
must appear at least once, no less than 15 days prior to the public hearing. The notice must include:
A. The present location of the building to be moved.
B. The proposed new location of the building including legal description and address. If no address is available, a
description that is clear to the average person will suffice.
C. The type of building to be moved.
D. The proposed use of the building.
E. The time, date, and place of the public hearing. (Refer to attached Planning Commission meeting schedule).
5. Request for permit is heard by the Planning Commission. Planning Commission By-Laws require a representative to be
present at the public hearing. If no representative is present, the request will be held in committee.
6. Following the public hearing, the Planning Commission will submit its recommendation to the City Council.
7. The City Council may grant or deny the application and/or attach further conditions deemed necessary.