GSA P100 Submittal Matrix (2021) - Version 1.0 GSA P100 Submittal Matrix (2021) - Version 1.0
The submittal matrix is provided to document the baseline submittal
requirements for the four project delivery methods and funding
codes.
Project teams must still provide the standard of care for a fully
constructible set of documents.
This matrix identifies items that GSA requires to validate that the
project is moving forward while meeting the requirements of P100.
Additional submittal requirements may be included in the project
contract.
Submittal Matrix
DELIVERY METHODS
Design Bid Build
1
Design / Build
2
Design / Build / Bridging
3
Construction Manager as
Constructor
4
Photo Credit: Chipper Hatter, Courtesy of the Miller Hull Partnership
Project Name
GSA P100 Submittal Matrix (2021) - Version 1.0 GSA P100 Submittal Matrix (2021) - Version 1.0
The submittal matrix is provided to document the baseline submittal
requirements for the four project delivery methods and funding
codes.
Project teams must still provide the standard of care for a fully
constructible set of documents.
This matrix identifies items that GSA requires to validate that the
project is moving forward while meeting the requirements of P100.
Additional submittal requirements may be included in the project
contract.
Submittal Matrix
DELIVERY METHODS
Design Bid Build
1
Design / Build
2
Design / Build / Bridging
3
Construction Manager as
Constructor
4
CONCEPT PHASE
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
START
END
Final
Concept
(BA 51, 55, 80,
ESPC)
Concept
Development
(BA 51, 55)
Preliminary
Concept
(BA 51, 55)
Design
Development 100%
(BA 51, 54, 55, 61, 80, ESPC)
CD Final
(BA 51, 54, 55, 61,
80, ESPC)
CD 95%
(BA 51, 54, 55, 80,
ESPC)
CD 65%
(BA 51, 54, 55, 80,
ESPC)
BA51 New Construction
BA61 Operating Funds for the purpose of repairs and
alterations
BA54 Minor Repair and Alterations BA80 Reimbursable Work Authorization
BA55 Major Repair and Alterations
ESPC Energy Savings Performance Contract including
utility projects
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
3
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Short narrative of any major accessibility/ABAAS compliance issues.
Provide sketches and additional narrative explaining the key accessibility issues significantly
impacting the concept design, such as: Site placement, Accessible route challenges, Program
requirements significantly impacted (e.g. - facility serving a high number of people with
disabilities).
For alterations and renovations projects, provide short narrative on accessible path of travel
obligations resulting from changes to primary function areas (ABAAS F202.4).
For addition type projects, describe the additional access modifications required for the
existing facility (ABAAS F202.2). For these alteration and addition requirements, explain the
budgetary impact and affect on the overall scope of the project.
Provide a statement outlining proposed methods to manage the observed and expected
changes in climate, based on the criteria in the statement of work (SOW) and the climate profile
information provided by GSA.
Identify project climate protection levels (CPLs) - outcome-focused, performance-based criteria
that informed the POR and other project criteria/specifications and include a simple phased
adaptation plan.
Include the proposed method of documentation for each project design milestone to track that
the design is able to adapt to changing conditions and include the thresholds to monitor the
asset.
A response template is available for use. The design team may use an alternate format but
must include the content in the GSA template.
Operations and Maintenance (O&M) Narrative for each of the design alternatives
Compare and contrast the O&M benefits and challenges.
N/A
N/A
Provide list of applicable codes
Provide the P100 matrix with performance tiers identified
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Reality Capture documentation (for an existing building, or historic site, and if required by
scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.
Source models to coordinate geolocation/geocoding of site and model orientation
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
4
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Short sustainable strategy narrative for each design concept. Include LEED, energy (including
EUI target), water, waste, and guiding principles.
Identify a preliminary LEED certification goal, including level and certification system. Address
LEED achievement plans in the Sustainable Strategy Narrative.
Provide basic information in the Sustainable Strategy Narrative explaining how Energy Net Zero
was considered.
Provide basic information in the Sustainable Strategy Narrative explaining how Water Net Zero
was considered.
N/A
Consider GSA's 2021 Guiding Principles Checklist. Mention Guiding Principles compliance plan
in Sustainable Strategy Narrative.
Provide initial energy usage intensity (EUI) design target. GSA's Energy Use Target Guidance
can help streamline calculations.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
5
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide short narrative of site's context regarding walkability, proximity to neighborhood
amenities, access to transit, and other pedestrian linkages around and through the site.
Provide graphics and short narrative to describe site's community planning context, with regard
to land use, economic development, urban design, relevant history, etc. and how that context
informs the concept.
Summarize consultation with local officials (to include names of stakeholders consulted,
meeting minutes, and whether the parties consulted appear to represent the array of local
demographics and opinions or whether further outreach to additional groups is needed) and
outline plans for further consultation.
Highlight relative merits or challenges presented by the various concepts.
Provide brief zoning and design guideline analysis of site and surroundings.
Discuss any uncertainties that the proposed concept would align with local requirements. Note
that local regulations must be followed without exception in the design of systems that have a
direct impact on off-site terrain or infrastructure.
Provide narrative that identifies potential areas inside and outside the building that would be
suitable for shared public use (incl. after hours). Highlight any significant challenges or
opportunities to create such spaces.
Provide a short narrative and preliminary supportive diagrams on each design concept
approach that clearly demonstrates site and landscape approach at a design scale.
Each design has considered SITES and how this will be achieved. Provide basic information on
the components and relationship of the spatial layout strategy.
Demonstrate compliance w/ federal stormwater law, EISA section 438 (Sustainable Sites
Section 3.3/ 6 points).
Each design has considered the overall site water balance and how that will be preserved
and/or enhanced through the various proposals.
Each design has considered the overall vegetation approach and how water required for
irrigation will be harvested from non potable sources.
Each design has considered the surface parking requirements of the project program and
provided a spatial approach that meets specific criteria identified in P100.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
6
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
Proposed fenestration systems are appropriate to the climate.
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
7
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
All major spaces are identified with appropriate adjacencies and reasonable size related to the
program by division or areas.
Provide the project objectives relative to the scope.
Plans identifying support spaces with appropriate adjacencies and reasonable size related to
the program
Mechanical rooms and service spaces are of sufficient size and quantity to accommodate all
required equipment; consider maintenance/installation/removal of equipment.
N/A
Short narrative on each design concept. Include basic calculations showing all assumptions.
Three (3) overall building concept designs including drawings, BIM, renderings & photos.
Compare net, usable and gross SF of design concepts to program.
N/A
N/A
N/A
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
8
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
All support spaces identified with appropriate adjacencies and reasonable size related to the
program
Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate
maximum occupant load.
Show a reasonable vertical profile that will allow for systems integration.
Floor-to-floor heights are sufficient to accommodate any utilities/cabling/above ceiling
requirements.
Overall exterior design is in keeping with specific program requirements by project; exterior is
easy to maintain.
Show a reasonable representation of all of the exterior planes to include materiality and
fenestration; describe the design intent for the enclosure system(s): (barrier wall, cavity wall,
curtain wall, rain screen, etc.).
N/A
Provide an electronic massing model on a common base, for each design scheme. No
fenestration.
Show that no major obvious deficiencies are present in the design. Document any deficiencies
or waivers required.
Interior and exterior architectural features are code compliant
N/A
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
9
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Prepare narrative that summarizes design loads.
Provide geotechnical report. Provide minutes from report recommendations discussion with
GSA structural engineer, landscape architect, and architect.
N/A
Identify any special materials or potential construction methods that are planned or could
potentially be required.
Narrative describing a minimum of 3 alternatives schemes/materials (including superstructure
and foundations) to be considered.
Narrative describing anticipated content of calculations including any special requirements that
involve unusual features of the design or complex analysis methods.
N/A
Narrative that identifies historic status and related potential constraints
Narrative summarizing anticipated physical security requirements and standards. Include FSL
information from FSC.
Narrative identifying project site characteristics and civil design challenges
MISCELLANEOUS
COMPONENTS
Chapter 4
Narrative summarizing primary structural and facade attachments to the exterior of the building
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
10
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Describe at least three HVAC Concepts for the proposed designs.
Criteria to be used for Energy Goals
Describe the Tiers to be used in the Mechanical Design.
Identify mechanical spaces.
Develop all base assumptions.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
11
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Description of the water reduction goals
Criteria to be used for Energy Goals (such as solar hot water)
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
12
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Show basic location of mechanical/electrical rooms
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Design team fire protection engineer must provide a narrative regarding the applicable codes
and standards, and special requirements referenced in P100 that relate to the site and the
proposed occupancy use.
Construction, protection, egress facilities, and occupancy features necessary to minimize
danger to life, property, and mission continuity from the effects of fire, including smoke, heat,
and toxic gases. adherence to all applicable codes and standards, and special requirements
referenced in P100.
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
13
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
14
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Project is viable from a cost standpoint
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
15
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
N/A
List any exceptions or deviations from Customer Agency Design Guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
16
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Narrative addressing treatment of historic property on sites acquired for new construction,
visual impact of new construction on adjoining historic property, planned mitigation for affected
archeological resources, treatment of preservation zones in GSA-controlled historic buildings.
Consult Regional Historic Preservation Officer and Building Preservation Plan.
N/A
Assess potential for archeological artifacts before site acquisition and before initiating design
for work requiring ground disturbance on federally controlled property. Consult Regional
Historic Preservation Officer regarding 106 compliance requirements.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
17
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
18
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative of accessibility strategy addressing accessible routes, toilet rooms, ramps, traffic
conflicts, pedestrian crossings, changes in grade and locations of accessible parking and
drop-offs, signage and main entrance identification and visibility. For any unique/speciality
spaces (courtrooms, assembly, exhibit, etc.), address key access issues including number of
accessible spaces.
Alterations/additions: Describe accessibility barriers technically infeasible (as defined by
ABAAS) to remedy and alternatives to provide access.
Historic Preservation: Identify any ABAAS exceptions, the reasoning for it, and likelihood for
concurrence by the appropriate historic preservation officer or council.
Diagrams and drawings:
Site - Proposed accessible routes for pedestrians from proposed accessible surface parking
locations, drop-off and public transit to front entrance to include locations of ramps, curb cuts
and viewability as applicable.
Building - Proposed accessible routes for pedestrians from main entrances and proposed
accessible in-building parking locations, to elevator lobbies, accessible bathrooms and primary
function spaces as applicable.
Highlight areas where accessibility may conflict with other building systems/components. Cite
local codes and restrictions in addition to ABAAS.
If the POR is updated, then update the climate statement to reflect relevant findings and
changes. Identify strategies and elements in the drawings and reference in the statement.
Refine the O&M Narrative submission for the chosen alternative from the previous submission.
Submit Operational Excellence Concept checklist.
Highlight relevant responses to previous submission comments.
Provide list of applicable codes.
Provide assessment of hazardous materials
Update the P100 matrix.
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Reality Capture documentation (for an existing building, or historic site, and if required by
scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.)
Source models to coordinate geolocation/geocoding of site and model orientation
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
19
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Narrative detailing the integrated design process, the design's sustainability strategy, and
technologies that are expected to help achieve building performance
Draft LEED scorecard with expected points, possible points, and points that are unlikely or not
applicable
Narrative describing type and size of renewable energy generating equipment, if any, planned
for the project. Identify any infrastructure for post-project additional renewable installation, or
any plans for more renewables to be added post-project.
Narrative describing any water net zero strategies
Describe strategy for managing waste in the Sustainable Strategy Narrative. Identify
appropriate space for waste net zero activities in the drawings.
Complete GSA's Guiding Principles Checklist. Ensure project scope meets their requirements to
be on track for compliance.
Develop a Design Performance Model to compare to the design EUI.
Narrative describing daylight, view and glare strategy including initial calculations to meet
Designing for Daylight
Provide initial LCC for equipment that use energy or water.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
20
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide additional detail of site's context, as appropriate, to properly evaluate the concept.
Include graphics and narrative to provide additional detail for the site's community planning
context, as appropriate, to properly evaluate the concept and its ability to align with local
planning, design, and development goals.
Provide additional details of zoning and design guideline analysis of site and surroundings, as
appropriate, to evaluate the concept.
Provide additional details for shared public use, as appropriate, to evaluate the concept.
Extended narrative and supporting diagrams describing the site layout spatial design approach.
Include all critical site relationships both architectural and non architectural, site hydrology and
circulation systems, all critical design spot elevations (including adjacent landscape) finished
floor elevations, and all discrete spatial site features being proposed.
Critical areas depicting the landscape should be provided including an illustrative plan, critical
illustrative sections, and critical landscape architectural renderings that depict the design
character and quality of the proposal.
SITES scorecard with expected points, possible points, and points not applicable.
Various approaches to achieve compliance with SITES Credit 3.4 for 5 points are identified for
the project.
Various approaches to achieve compliance with P100 for Parking Field design have been
explored.
Each approach provides a rough order of magnitude assessment of total parking stalls
proposed, impact and relationship to site hydrology and architectural layout, and a diagram
legend with the overall paved surface being proposed relative to the total parking provided.
All vegetation required for Parking Field design are calculated and located within the Parking
Field as per the design requirement.
Various approaches to achieve compliance with EISA section 438 and SITES Credit 3.3- for 6
points are identified for the project and site systems are diagrammed.
A separate brief submission is required to demonstrate compliance with EISA section 438. Any
potential project divergence from following the intent of the Federal Law needs to be raised to
the full client team at this time and consultation with Project Management staff and National
Subject Matter experts needs to begin in earnest.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
21
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
Proposed insulation types and considerations
Proposed fenestration systems are appropriate to the climate. Proposed designs are readily
achievable and do not pose unusual risks in terms of constructability, performance, ease of
maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance.
Proposed enclosure systems are accessible for regular maintenance.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
22
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Drawings should include at a minimum: entrances, lobbies, corridors, stairways, elevators, work
areas, special spaces, mechanical rooms for major equipment and air handlers, and service
spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated.
Building elevations and sections labeling most important spaces and showing floor-to-floor
heights and other critical dimensions and elevations.
N/A
Floorplans of all service spaces, including mailrooms and loading dock/access
Floorplans of all service spaces, including mailrooms and loading dock/access
Extended narrative and further developed calculations. Calculations must refer to code,
paragraph of code used, standards, and text books used for specific portion of calculation.
Refinement of selected concept, additional detail in drawings and BIM model
Compare net, usable and gross SF of design concept to program.
N/A
N/A
N/A
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
23
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
All support spaces identified with appropriate adjacencies and reasonable size related to the
program
Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate
maximum occupant load
Sections, floor-to-floor, indicating ALL critical dimensions
Floor and Roof Elevations, Labeled
Elevations of major public spaces
Interior design for major public spaces aligns with building architectural requirements
Provide an electronic massing model to give a sense of the design including materiality and
fenestration.
N/A
Identify public vs. private areas, identify paths of travel.
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
24
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Update narrative. List design loads on schematic plans.
Narrative addressing alternative foundation approaches including benefits, challenges and
relative costs associated for each approach
Narrative addressing potential vibration issues associated with selected structural scheme
Update narrative. Provide schematic plans showing location of innovative materials and notes
for special construction methods.
Update narrative identifying strengths and weaknesses of alternatives. Provide schematic
plans showing recommended approach.
Coordinate project calculation package requirements with GSA Structural Engineer. Update
narrative.
N/A
Update historic narrative.
Update narrative, including FSL designation. Identify special requirements on schematic plans.
Update civil narrative. Provide schematic site plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Provide schematic drawings showing locations.
Update narrative and schematic drawings. Existing structures - identify concealed structural
conditions that require probes or non-destructive testing, anchor pull test, steel coupon tests,
concrete cores, etc,
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
25
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Comparison of the three mechanical systems and equipment for the selected design
Criteria used for Energy Analysis of each of the three systems
Identify how Tier criteria is used in each of the three options
Refined Rough order of Magnitude for each of the three choices
Major mechanical equipment layed out in the mechanical spaces for each of the three
concepts.
Preliminary Equipment Schedules
Apply Base Assumptions to each of the 3 mechanical concepts
Provide a dew point analysis
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
26
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Domestic cold water
Domestic hot water
Sanitary systems
Storm drainage
Irrigation
Proposed building zoning and major piping runs
Locations of proposed plumbing fixtures and equipment
Rough order of magnitude water consumption calculations
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
27
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Stacking, basic room sizes, and locations of major equipment
N/A
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
28
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
29
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Project is viable from a cost standpoint
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
30
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's design philosophy regarding courtroom spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
31
Concept Design: Concept Development / Second Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative with each submission) - narrative, photos,
drawings explaining preservation design issues and proposed solutions. See Appendix A for
report outline template.
Show existing major site utilities.
Archeological compliance submittals in accordance with 106 consultation terms for projects
involving ground disturbance - coordinate with RHPO
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Discipline
Concept Design: Concept Development / Second Design Review (BA 51, 55)
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
32
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Lead designer's architectural design philosophy is in keeping with GSA's philosophies and
values
Provide a statement of design philosophy and how lead designer expects to collaborate with
artists on this project.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Preliminary Concept
Concept Development
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
33
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Refined narrative of accessibility strategy with diagrams and drawings explaining the key
issues.
Show primary accessible path of travel to include relevant elements including bathrooms,
drinking fountains, entrance doorways.
Show all required clearances of accessible routes to include widths of corridors, non complying
projections, floor transitions, lighting and clear floor areas at all doors along route.
Provide finalized Concept statement. If the POR is updated, then update the climate statement
to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Narrative discussing plans for exterior operations and maintenance (window washing,
relamping, etc.)
Highlight relevant responses to previous submission comments. Provide a list of any
outstanding substantive comments that have not been resolved.
Provide narrative statement that the proposed design will comply with the applicable codes.
Safety narrative including hazardous materials, fall protection, and arc flash requirements.
Updated P100 matrix with statement that the proposed design will comply with P100 and the
performance tiers.
List any approved waivers.
Design BIM of Final Design Concept demonstrating that the Final Design Concept aligns with
the building program. Final Concept model contains all SDM data for all spaces/rooms.
IFC File export from Design BIM
BIM Execution, COBie-Playbook & GSA-CDX information plan updated- Initial COBie
Spreadsheet
BIM QC Checklist: Identifies what is currently contained in Design BIM
Conceptual Energy BIM Model files (if required)
Final Concept O&M Narrative, Operational Excellence Checklist submission.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
34
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Clearly identify sustainable design strategies on the drawings.
Updated LEED scorecard showing enough points expected to meet contractual requirement.
Finalized description of renewables planned for the project.
Identify location and amount of any renewable equipment planned for post-project addition.
Finalized water strategy, and clear designation of components within the drawings.
Finalized waste strategy, and clear designation of components within the drawings.
Update Guiding Principles Checklist if/as appropriate.
Develop Building Energy Model to compare to the design EUI.
Energy consumption calculations and analysis
Finalize narrative and calculations showing compliance with Designing for Daylight.
Provide detailed LCC for equipment that use energy or water
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
35
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide final analysis of the concept's status with regard to P100 sustainable location standards,
including transit access and walkability.
Provide final narrative on site's relation to local planning context and how the proposed design
responds to local goals.
Highlight any outstanding uncertainties or opportunities that require further consultation or
analysis.
Per P100, local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure; the concept package must clarify any
relevant areas that have not yet resolved relevant issues.
Provide final zoning analysis. Describe status of local review and comment.
Provide additional details as appropriate to evaluate the concept.
For relevant interior assembly or other spaces, denote design strategy and estimated
occupancy capacities for various uses.
For exterior spaces, describe design strategy to support both passive and programmed uses,
including estimated site seating capacities.
All site strategies are clearly shown and identified within the drawings and further developed
from the second peer review stage with all peer review commentary responded to.
Update SITES scorecard showing enough points achievable to meet contracted requirement
and all possible points that require owner operational commitments are identified.
Narrative and drawing material required to achieve the preferred approach for SITES Credit 3.3-
for 6 points are prepared and submitted.
Draft materials required to achieve the preferred approach for SITES Credit 3.4 for 5 points..
Narrative and drawings with requisite calculations, including permeable and impermeable area,
number of parking stalls, number of trees required and proposed, and sustainable features
such as biofiltration areas, level spreaders, infiltration chambers, etc.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
36
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
Describe quantity, type(s), size(s), and complexity of proposed mock-ups.
Describe roofing type. Indicate roof slopes and drain locations. Indicate type and extents of fall
protection. Indicate means of safe suspended access.
Describe air barrier types.
Proposed insulation types and considerations. Compare design performance model to design
EUI.
Proposed fenestration systems are appropriate to the climate.
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance.
Proposed enclosure systems are accessible for regular maintenance.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
37
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Continued development of selected concept. Include demolition plans, floor plans showing:
Work areas, lobbies, corridors, entrances, stairways, elevators, special spaces, and service
spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated.
Office areas must show proposed layouts down to the office level of detail.
Verify the integration between the approved program and the building concept is achievable, in
tabular form, including net, usable and gross SF
N/A
Drawing and narrative indicating plan for accessing and maintaining equipment, including
clearance requirements for maintenance, operation, and removal
Indicate distance and travel path from/to freight elevators and loading dock; include size &
weight of equipment.
Floorplans of all service spaces, including mailrooms loading dock. Provide analysis of loading
dock in narrative format, along with any pertinent calculations.
Further refinement of narrative and calculations, including acoustical calculations for envelope,
interior walls/floors/ceilings, mechanical and electrical equipment. Heat transfer in building
envelope, toilet fixture count, illumination/daylighting/glare, elevator analysis, loading dock
analysis
Further refinement of selected concept
Floor plans, elevations showing fenestration, exterior materials, cast shadows
Interior elevations of major spaces, building sections showing adequate space for all systems
Color renderings, physical model to convey the architectural intent of the design
Compare net, usable and gross SF of design concepts to program.
Description of interior finish materials, with detailed explanation for public spaces
Identify millwork locations on plan.
Show proposed furniture locations on plan. Indicate ALL critical dimensions for ABAAS and
egress.
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Interior conditions (noise, temperature, etc.) will contribute to occupant comfort at maximum
occupant load levels
Identify areas that require acoustical solutions. Provide acoustical solution concepts, i.e., sound
masking, ceiling treatments, and wall treatments.
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
38
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
Floorplan showing open office and enclosed office area/layout & typical workstation design
intent
Office areas comply with GSA's Space Utilization Benchmark and that the integration between
the approved program and the building concept is achievable (this is also dependent on the
tenant)
Toilet fixture count analysis
Sections, floor-to-floor, indicating ALL critical dimensions
Elevations of major building facades; List of exterior materials proposed (provide samples upon
request)
Color renderings showing major public spaces (as defined by PM at the start of the project)
from different vantage points
Realistic electronic model of final concept
Code analysis
Identify public vs. private areas, identify paths of travel
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
39
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Finalize narrative and update schematic plans.
Finalize narrative with recommended preferred foundation approach with supporting
information. Show foundations on schematic plans.
Finalize narrative, prepare preliminary calculations and include information on schematic plans.
Finalize narrative and update schematic plans.
Update narrative and schematic plans. Provide preliminary calculations verifying major member
depths.
Final analysis and calculations narrative
N/A
Final historic narrative
Update narrative and schematic plans, including FSL designation. Provide preliminary
calculations verifying size of forced protection structural elements.
Final civil narrative and schematic plans
MISCELLANEOUS
COMPONENTS
Chapter 4
Final narrative and schematic drawings. Existing structures - identify concealed structural
conditions that require probes or non-destructive testing, anchor pull test, steel coupon tests,
concrete cores, etc.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
40
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Concept narrative to include:
Indoor and outdoor design conditions for all spaces under occupied, 24-hour, and unoccupied
conditions
Ventilation rates, dehumidification, and pressurization criteria for all spaces under occupied,
24-hour, and unoccupied conditions
Equipment capacities, weights, sizes, and power requirements
Description of heating, cooling, ventilating, and dehumidification systems for each major
functional space
Description of heating, cooling, ventilating, and dehumidification control strategies for each air
handling system under occupied, 24-hour, and unoccupied conditions
Fuel and utility requirements
Proposed system showing:
Extent of existing HVAC to be removed if applicable
Identification of spaces for mechanical equipment
Air flow riser diagrams representing supply, return, outside air, and exhaust systems
Water flow riser diagrams of the main mechanical systems
Preliminary building heating and cooling load calculations including U-value calculations, room
and zone inputs and summaries
Preliminary indoor and outdoor design conditions for all spaces under occupied, 24-hour, and
unoccupied conditions
Preliminary ventilation rates, dehumidification, and pressurization criteria for all spaces under
occupied, 24-hour, and unoccupied conditions
Psychrometric calculations for HVAC systems at full load and partial loads. (Partial loads at 50%
and 25%, and unoccupied periods)
Water consumption calculations and analysis including make-up water for HVAC systems
Fuel consumption estimates
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
41
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Evaluation of alternate sources for preheating of domestic water (solar or heat recovery)
Update previous drawings to include:
Systems schematics and flow diagrams
Water Flow Riser diagrams of the main mechanical systems in the mechanical room(s) and
throughout the building
Water consumption calculations and analysis including domestic water and irrigation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
42
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
Preliminary one-line for facility service entrance through to main switchgear/switchboard and
emergency/standby distribution
Further development of stacking, room sizes, equipment loading paths and locations of major
equipment
Approximate service size calculation + generators + onsite generation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
43
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Narrative description of:
The building's proposed construction features
Means of egress system
Water-based fire extinguishing systems
Non water-based fire extinguishing systems
Smoke control systems
Fire alarm and emergency communication system
Fire service access elevators (if applicable)
Occupant evacuation elevators (if applicable)
Drawings (Floor Plans) showing:
Equipment spaces for fire protection systems (fire pump, fire command center, etc.)
Fire protection water supplies, fire hydrant locations, fire apparatus access roads, and fire lanes
N/A
Code analysis
GSA P100 Submittal Matrix (2021) - Version 1.0
Demonstrate that the project is developing on-budget.
VM- List of cost-saving items that would collectively reduce the project cost to approximately
10% below budget
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
44
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate- Executive Summary
Project is viable from a cost standpoint
Supporting Analysis- Basis of estimate, rationale, assumptions, and market analysis as required
in the P-120
Cost Plan Update- GSA Reports 3473, 3474
Cost Estimate- Summary Reports (ASTM UNIFORMAT II and CSI MasterFormat formats as
applicable)
Cost Estimate- Detail line item cost reports
Cost Estimate- Detail line item cost reports
Cost Estimate- Provide separate estimates for phased work, or bid alternates/options.
QC Review- Verify that the final concept can be constructed within the project budget.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
45
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's Design Philosophy regarding Courtroom spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
46
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative, as design develops-due with each submission)
Report, Narrative, Photographs and Drawings detailing building size, location, materials, design,
condition, and preservation design concepts. See Design Guidelines for detailed information
and more information on requirements.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
1 - DBB
Construction Type
2 - DB
3 - DB Bridging
4 - CMC
Project Phase
Discipline
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
Preliminary Concept
Concept Development
Final Concept
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
47
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0 GSA P100 Submittal Matrix (2021) - Version 1.0
Submittal Matrix
DELIVERY METHODS
The submittal matrix is provided to document the baseline submittal
requirements for the four project delivery methods and funding
codes.
Project teams must still provide the standard of care for a fully
constructible set of documents.
This matrix identifies items that GSA requires to validate that the
project is moving forward while meeting the requirements of P100.
Additional submittal requirements may be included in the project
contract.
Design Bid Build
1
Design / Build
2
Design / Build / Bridging
3
Construction Manager as
Constructor
4
CONCEPT PHASE
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
START
END
Post-Award
Concept
(BA 51, 55, 80,
ESPC)
Pre-Award
Concept
(BA 51, 55, 80,
ESPC)
Final
Concept
(BA 51, 55, 80,
ESPC)
CD Final
(BA 51, 54, 55, 61,
80, ESPC)
CD 95%
(BA 51, 54, 55, 80,
ESPC)
CD 65%
(BA 51, 54, 55, 80,
ESPC)
Design
Development 100%
(BA 51, 54, 55, 61, 80, ESPC)
BA51 New Construction
BA61 Operating Funds for the purpose of repairs and
alterations
BA54 Minor Repair and Alterations BA80 Reimbursable Work Authorization
BA55 Major Repair and Alterations
ESPC Energy Savings Performance Contract including
utility projects
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
General Information
Discipline
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
49
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative overview of any major accessibility/ABAAS compliance issues for each concept
Provide sketches and additional narrative explaining the key accessibility issues significantly
impacting the concept design (site placement, accessible route challenges, program
requirements significantly impacted such as facility serving a high number of people with
disabilities).
For alterations and renovations projects, provide narrative on accessible path of travel
obligations resulting from changes to primary function areas (ABAAS F202.4).
For addition type projects, describe the additional access modifications required for the
existing facility (ABAAS F202.2).
For these alteration and addition requirements, explain the budgetary impact and affect on the
overall scope of the project.
Provide a statement outlining proposed methods to manage the observed and expected
changes in climate, based on the criteria in the statement of work (SOW) and the climate profile
information provided by GSA.
Identify project climate protection levels (CPLs) - outcome-focused, performance-based criteria
that informed the POR and other project criteria/specifications and include a simple phased
adaptation plan.
Include the proposed method of documentation for each project design milestone to track that
the design is able to adapt to changing conditions and include the thresholds to monitor the
asset. A response template is available for use.
The design team may use an alternate format but must include the content in the GSA
template.
Provide an Operations and Maintenance (O&M) Narrative for each of the alternatives. Address
the O&M benefits, challenges, and estimated LCC.
Submit Operational Excellence Concept Checklist
N/A
Provide list of applicable codes and compliance narrative.
Provide assessment of hazardous materials.
Provide the P100 matrix with performance tiers identified.
Source models for concept validation
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
50
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Short sustainable strategy narrative for each design concept. Include LEED, energy (including
EUI target), water, waste, and guiding principles.
Identify a preliminary LEED certification goal, including level and certification system. Address
LEED achievement plans in the Sustainable Strategy Narrative.
Provide basic information in the Sustainable Strategy Narrative explaining how Energy Net Zero
was considered.
Provide basic information in the Sustainable Strategy Narrative explaining how Water Net Zero
was considered.
N/A
Achieve LEED BD+C silver or better, and consider GSA's 2021 Guiding Principles Checklist.
Mention Guiding Principles compliance plan in Sustainable Strategy Narrative.
Provide initial energy usage intensity (EUI) design target. GSA's Energy Use Target Guidance
can help streamline calculations.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
51
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide short narrative of site's context regarding walkability, proximity to neighborhood
amenities, access to transit, and other pedestrian linkages around and through the site.
Provide graphics and short narrative to describe site's community planning context, with regard
to land use, economic development, urban design, relevant history, etc. and how that context
informs the concept.
Summarize consultation with local officials (to include names of stakeholders consulted,
meeting minutes, and whether the parties consulted appear to represent the array of local
demographics and opinions or whether further outreach to additional groups is needed) and
outline plans for further consultation.
Highlight relative merits or challenges presented by the various concepts.
Provide brief zoning and design guideline analysis of site and surroundings.
Discuss any uncertainties that the proposed concept would align with local requirements.
Note that local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure.
Provide narrative that identifies potential areas inside and outside the building that would be
suitable for shared public use (including after hours).
Highlight any significant challenges or opportunities to create such spaces.
Provide a short narrative and preliminary supportive diagrams on each design concept
approach that clearly demonstrates site and landscape approach at a design scale.
Each design has considered SITES and how this will be achieved.
Provide basic information on the components and relationship of the spatial layout strategy.
Brief narrative and/or annotated site plan describing overall site water balance and how that will
be preserved and/or enhanced through the various proposals
Brief narrative and/or annotated site plan describing overall vegetation approach and how
water required for irrigation will be harvested from non potable sources
Brief narrative and/or annotated site plan describing surface parking requirements of the
project program and provided a spatial approach that meets specific criteria identified in the
P100 Facility Standard.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
52
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
Proposed fenestration systems are appropriate to the climate
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance
Proposed enclosure systems are accessible for regular maintenance
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
53
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
All major spaces identified with appropriate adjacencies and reasonable size related to the
program by division or areas
Project objectives and scope. Area of work plans.
Plans identifying support spaces with appropriate adjacencies and reasonable size related to
the program
Mechanical rooms and service spaces are of sufficient size and quantity to accommodate all
required equipment; consider maintenance/installation/removal of equipment.
N/A
Short narrative on design concept. Include summary sheet of calculations showing all
assumptions, applicable codes and standards referenced, and conclusions.
Calculations should include engineering sketches.
An overall building concept designs including drawings, BIM, renderings & photos
Compare net, usable and gross SF of design concepts to program.
N/A
N/A
N/A
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
54
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
All support spaces identified with appropriate adjacencies and reasonable size related to the
program
Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate
maximum occupant load
Show a reasonable vertical profile/section that will allow for systems integration
Floor-to-floor heights are sufficient to accommodate any utilities/cabling/above ceiling
requirements
Show a reasonable representation of all of the exterior planes to include materiality and
fenestration; describe the design intent for the enclosure system(s): (barrier wall, cavity wall,
curtain wall, rain screen, etc.).
Overall exterior design is in keeping with specific program requirements by project; exterior is
easy to maintain
N/A
Provide an electronic massing model to give a sense of the design including materiality and
fenestration.
Show that no major obvious deficiencies are present in the design.
Document any deficiencies or waivers required.
Interior and exterior architectural features are code compliant
N/A
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
55
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Prepare narrative that summarizes design loads.
Provide geotechnical report.
Provide minutes from report recommendations discussion with GSA structural engineer.
N/A
Identify any special materials or potential construction methods that are planned or could
potentially be required.
Narrative describing a minimum of 3 alternatives schemes/materials (including superstructure
and foundations) to be considered
Narrative describing anticipated content of calculations including any special requirements that
involve unusual features of the design or complex analysis methods
N/A
Narrative that identifies historic status and related potential constraints
Narrative summarizing anticipated physical security requirements and standards
Include FSL information from FSC.
Narrative identifying project site characteristics and civil design challenges
MISCELLANEOUS
COMPONENTS
Chapter 4
Narrative summarizing primary structural and facade attachments to the exterior of the building
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
56
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Describe at least three HVAC Concepts for the proposed designs,
Criteria to be used for Energy Goals
Describe the Tiers to be used in the Mechanical Design.
Identify mechanical spaces.
Develop all base assumptions.
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
57
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Description of the water reduction goals
Criteria to be used for Energy Goals (such as solar hot water)
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
58
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Show basic location of mechanical/electrical rooms.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
59
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Design team fire protection engineer must provide a narrative regarding the applicable codes
and standards, and special requirements referenced in P100 that relate to the site and the
proposed occupancy use.
Construction, protection, egress facilities, and occupancy features necessary to minimize
danger to life, property, and mission continuity from the effects of fire, including smoke, heat,
and toxic gases. adherence to all applicable codes and standards, and special requirements
referenced in P100.
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
60
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
61
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
62
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Narrative addressing treatment of historic property on sites acquired for new construction,
visual impact of new construction on adjoining historic property, planned mitigation for affected
archeological resources, treatment of preservation zones in GSA-controlled historic buildings
Consult Regional Historic Preservation Officer and Building Preservation Plan.
N/A
Assess potential for archeological artifacts before site acquisition and before initiating design
for work requiring ground disturbance.
On federally controlled property-consult Regional Historic Preservation Officer regarding 106
compliance requirements.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Pre-Award Concept
Project Phase
Post-Award Concept
Final Concept
Discipline
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
63
Pre-Award Concept Design: Phase II Offeror Technical Proposal Submission (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Lead designer's architectural design philosophy is in keeping with GSA's philosophies and
values
Provide documentation of the deviations from the P100 (if applicable) along with reasons for
deviation
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
64
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative overview of any major accessibility and ABAAS compliance issues for each concept.
Provide sketches and additional narrative explaining the key accessibility issues significantly
impacting the concept design (site placement, accessible route challenges, program
requirements significantly impacted such as facility serving a high number of people with
disabilities).
For alterations and Narrative of accessibility strategy addressing accessible routes, toilet
rooms, ramps, traffic conflicts, pedestrian crossings, changes in grade and locations of
accessible parking and drop-offs, signage and main entrance identification and visibility. For
any unique/speciality spaces (courtrooms, assembly, exhibit, etc.), address key access issues
including number of accessible spaces.
Alterations/additions: Describe accessibility barriers technically infeasible (as defined by
ABAAS) to remedy and alternatives to provide access.
Historic Preservation: Identify any ABAAS exceptions, the reasoning for it, and likelihood for
concurrence by the appropriate historic preservation officer or council. projects, provide
narrative on accessible path of travel obligations resulting from changes to primary function
areas (ABAAS F202.4). For addition type projects, describe the additional access modifications
required for the existing facility (ABAAS F202.2). For these alteration and addition
requirements, explain the budgetary impact and affect on the overall scope of the project.
Provide finalized Concept statement. If the POR is updated, then update the statement to
reflect relevant findings and changes. Identify strategies and elements in the drawings and
reference in the statement.
Refine the O&M Narrative.
Submit Operational Excellence Concept Checklist.
Highlight relevant responses to previous submission comments.
Provide list of applicable codes and compliance narrative.
Safety narrative including hazardous materials, fall protection, and arc flash requirements.
Update the P100 matrix.
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Source Models
IFC model translations
Updated spatial validation / calculations
Updated COBie Spreadsheet (Concept information)
Updated Energy BIM Model files (if required)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
65
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Narrative detailing the integrated design process, the design's sustainability strategy, and
technologies that are expected to help achieve building performance
Draft LEED scorecard with expected points, possible points, and points that are unlikely or not
applicable.
Narrative describing type and size of renewable energy generating equipment, if any, planned
for the project. Identify any infrastructure for post-project additional renewable installation, or
any plans for more renewables to be added post-project.
Narrative describing any water net zero strategies
Describe strategy for managing waste in the Sustainable Strategy Narrative. Identify
appropriate space for waste net zero activities in the drawings.
Complete GSA's Guiding Principles Checklist. Ensure project scope meets their requirements to
be on track for compliance.
Develop a Design Performance Model to compare to the design EUI.
Narrative describing daylight, view and glare strategy including initial calculations to meet
Designing for Daylight
Provide initial LCC for equipment that use energy or water.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
66
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide additional detail, as appropriate, to properly evaluate the concept.
Include graphics and narrative to provide additional detail, as appropriate, to properly evaluate
the concept and its ability to align with local planning, design, and development goals.
Provide additional details as appropriate to evaluate the concept.
Provide additional details as appropriate to evaluate the concept.
Extended narrative and supporting diagrams describing the site layout spatial design approach,
including all critical site relationships both architectural and non architectural, site hydrology
and circulation systems, all critical design spot elevations (including adjacent landscape)
finished floor elevations, and all discrete spatial site features being proposed
Critical areas depicting the landscape should be provided including an illustrative plan, critical
illustrative sections, and critical landscape architectural renderings that depict the design
character and quality of the proposal
SITES scorecard with expected points, possible points, and points not applicable
Various approaches to achieve compliance with EISA section 438 and SITES Credit 3.3- for 6
points are identified for the project and site systems are diagrammed.
A separate brief submission is required to demonstrate compliance with EISA section 438. Any
potential project divergence from following the intent of the Federal Law needs to be raised to
the full client team at this time and consultation with Project Management staff and National
Subject Matter experts needs to begin in earnest.
Various approaches to achieve compliance with SITES Credit 3.4 for 5 points are identified for
the project.
Various approaches to achieve compliance with the P100 Facility Standard for Parking Field
Design have been explored. Each approach provides a rough order of magnitude assessment
of total parking stalls proposed, impact and relationship to site hydrology and architectural
layout, and a diagram legend with the overall paved surface being proposed relative to the total
parking provided. All vegetation required for Parking Field design are calculated and located
within the Parking Field as per the design requirement.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
67
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
Proposed insulation types and considerations
Proposed fenestration systems are appropriate to the climate.
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance.
Proposed enclosure systems are accessible for regular maintenance.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
68
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Drawings should include at a minimum: entrances, lobbies, corridors, stairways, elevators, work
areas, special spaces, mechanical rooms for major equipment and air handlers, and service
spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated.
Building elevations and sections labeling most important spaces and showing floor-to-floor
heights and other critical dimensions and elevations.
N/A
Floorplans of mechanical rooms for major equipment and air handlers
Floorplans of all service spaces, including mailrooms and loading dock/access
Extended narrative and further developed calculations
Calculations must refer to code, paragraph of code used, standards, and text books used for
specific portion of calculation.
Refinement of selected concept, additional detail in drawings and BIM model. Compare net,
usable and gross SF of design concept to program.
N/A
N/A
N/A
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
69
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
N/A
Sections, floor-to-floor, indicating ALL critical dimensions
Floor and Roof Elevations, Labeled
Elevations of major public spaces
Interior design for major public spaces aligns with building architectural requirements
Provide an electronic massing model on a common base, for each design scheme. No
fenestration.
N/A
Identify public vs. private areas, identify paths of travel.
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
70
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Update narrative. List design loads on schematic plans.
Narrative addressing alternative foundation approaches including benefits, challenges and
relative costs associated for each approach
Narrative addressing potential vibration issues associated with selected structural scheme
Update narrative. Provide schematic plans showing location of innovative materials and notes
for special construction methods.
Update narrative identifying strengths and weaknesses of alternatives. Provide schematic
plans showing recommended approach.
Coordinate project calculation package requirements with GSA Structural Engineer. Update
narrative.
N/A
Update narrative.
Update narrative, including FSL designation. Identify special requirements on schematic plans.
Update narrative. Provide schematic site plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative. Provide schematic drawings showing locations.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
71
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Comparison of the three mechanical systems and equipment for the selected design
Criteria used for Energy Analysis of each of the three systems
Identify how Tier criteria is used in each of the three options
Refined Rough order of Magnitude for each of the three choices
Major mechanical equipment layed out in the mechanical spaces for each of the three concepts
Preliminary Equipment Schedules
Apply Base Assumptions to each of the 3 mechanical concepts.
Provide a dew point analysis.
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
72
Post-Award Concept Design: Design Review (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Domestic cold water
Domestic hot water
Sanitary systems
Storm drainage
Irrigation
Proposed building zoning and major piping runs
Locations of proposed plumbing fixtures and equipment
Rough order of magnitude water consumption calculations
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
Post-Award Concept Design: Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
73
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Stacking, basic room sizes, and locations of major equipment
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
Post-Award Concept Design: Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
74
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
Post-Award Concept Design: Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
75
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
Post-Award Concept Design: Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
76
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's Design Philosophy regarding Courtroom spaces as laid out in
the U.S. courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
Post-Award Concept Design: Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
77
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative with each submission) - narrative, photos,
drawings explaining preservation design issues and proposed solutions. See Appendix A for
report outline template.
Existing major site utilities
Archeological compliance submittals in accordance with 106 consultation terms for projects
involving ground disturbance - coordinate with RHPO
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Pre-Award Concept
Post-Award Concept
Final Concept
Post-Award Concept Design: Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Page
78
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Lead designer's architectural design philosophy is in keeping with GSA's philosophies and
values
Provide a statement of design philosophy and how lead designer expects to collaborate with
artists on this project.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
79
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Refined narrative of accessibility strategy with diagrams and drawings explaining the key issues
Show primary accessible path of travel to include relevant elements including bathrooms,
drinking fountains, entrance doorways.
Show all required clearances of accessible routes to include widths of corridors, non complying
projections, floor transitions, lighting and clear floor areas at all doors along route.
Submit revised statement to reflect development of design. If the POR is updated, then update
the statement to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Final Concept O&M Narrative, Operational Excellence Checklist submission
Narrative discussing plans for exterior operations and maintenance (window washing,
relamping, etc.)
Highlight relevant responses to previous submission comments.
Provide a list of any outstanding substantive comments that have not been resolved.
Provide list of applicable codes and compliance narrative.
Safety narrative including hazardous materials, fall protection, and arc flash requirements.
Updated P100 matrix with statement that the proposed design will comply with P100 and the
performance tiers.
List any approved waivers.
Design BIM of Final Design Concept demonstrating that the Final Design Concept aligns with
the building program
Final Concept model contains all SDM data for all spaces/rooms.
IFC File export from Design BIM
Initial COBie Spreadsheet
BIM QC Checklist: Identifies what is currently contained in Design BIM
Updated Energy BIM Model files (if required)
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
80
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Clearly identify sustainable design strategies on the drawings.
Updated LEED scorecard showing enough points expected to meet contractual requirement.
Finalized description of renewables planned for the project
Identify location and amount of any renewable equipment planned for post-project addition.
Finalized water strategy, and clear designation of components within the drawings
Finalized waste strategy, and clear designation of components within the drawings
Update Guiding Principles Checklist if/as appropriate.
Develop Building Energy Model to compare to the design EUI.
Energy consumption calculations and analysis
Finalize narrative and calculations showing compliance with Designing for Daylight.
Provide detailed LCC for equipment that use energy or water.
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
81
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide final analysis of the concept's status with regard to P100 sustainable location standards,
incl. transit access and walkability.
Provide final narrative on site's relation to local planning context and how the proposed design
responds to local goals.
Highlight any outstanding uncertainties or opportunities that require further consultation or
analysis.
Per P100, local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure; the concept package must clarify any
relevant areas that have not yet resolved relevant issues.
Provide final zoning analysis. Describe status of local review and comment.
Provide additional details as appropriate to evaluate the concept.
For relevant interior assembly or other spaces, denote design strategy and estimated
occupancy capacities for various uses.
For exterior spaces, describe design strategy to support both passive and programmed uses,
including estimated site seating capacities.
All site strategies are clearly shown and identified within the drawings and further developed
from the second peer review stage with all peer review commentary responded to.
Update SITES scorecard showing enough points achievable to meet contracted requirement
and all possible points that require owner operational commitments are identified.
Narrative and drawing material required to achieve the preferred approach for SITES Credit 3.3-
for 6 points are prepared and submitted.
Draft materials required to achieve the preferred approach for SITES Credit 3.4 for 5 points.
Narrative and drawings with requisite calculations, including permeable and impermeable area,
number of parking stalls, number of trees required and proposed, and sustainable features
such as biofiltration areas, level spreaders, infiltration chambers, etc.
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
82
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
Draft PRELIMINARY Building Enclosure Commissioning (BECx) Plan.
Identify any testing required to address risk inherent in the design intent.
Describe mockup types required to develop consensus for the design intent and/or prove
system performance.
Describe quantity, type(s), size(s), and complexity of proposed mock-ups.
Describe roofing type.
Indicate roof slopes and drain locations.
Indicate type and extents of fall protection.
Indicate means of safe suspended access.
Describe air barrier types.
Proposed insulation types and considerations
Compare design performance model to design EUI.
Describe fenestration types.
Describe approach to below-grade waterproofing.
Describe approaches to fall protection and safe suspended access.
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
83
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Continued development of selected concept. Include demolition plans, floor plans showing:
Work areas, lobbies, corridors, entrances, stairways, elevators, special spaces, and service
spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated. Office areas
must show proposed layouts down to the office level of detail.
Verify the integration between the approved program and the building concept is achievable, in
tabular form, including net, usable and gross SF.
N/A
Drawing and narrative indicating plan for accessing and maintaining equipment, including
clearance requirements for maintenance, operation, and removal
Indicate distance and travel path from/to freight elevators and loading dock; include size &
weight of equipment.
Floorplans of all service spaces, including mailrooms loading dock
Provide analysis of loading dock in narrative format, along with any pertinent calculations.
Further refinement of narrative and calculations. Including acoustical calculations for envelope,
interior walls/floors/ceilings, mechanical and electrical equipment. Heat transfer in building
envelope, toilet fixture count, illumination/daylighting/glare, elevator analysis, loading dock
analysis
Further refinement of selected concept
Floor plans, elevations showing fenestration, exterior materials, cast shadows
Interior elevations of major spaces, building sections showing adequate space for all systems
Color renderings, physical model to convey the architectural intent of the design
Compare net, usable and gross SF of design concepts to program.
Description of interior finish materials, with detailed explanation for public spaces
Identify millwork locations on plan.
Show proposed furniture locations on plan.
Indicate ALL critical dimensions for ABAAS and egress.
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
84
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
Floorplan showing open office and enclosed office area/layout & typical workstation design
intent
Office areas comply with GSA's Space Utilization Benchmark and that the integration between
the approved program and the building concept is achievable (this is also dependent on the
tenant)
Toilet fixture count analysis
Sections, floor-to-floor, indicating ALL critical dimensions
Elevations of major building facades
List of exterior materials proposed (provide samples upon request)
Color renderings showing major public spaces (as defined by PM at the start of the project)
from different vantage points
Electronic model of final concept
Code analysis
N/A
Section Continues (previous page)
Interior conditions (noise, temperature, etc.) will contribute to occupant comfort at maximum
occupant load levels
Identify areas that require acoustical solutions. Provide acoustical solution concepts, i.e., sound
masking, ceiling treatments, and wall treatments.
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
85
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Finalize narrative and update schematic plans.
Finalize narrative with recommended preferred foundation approach with supporting
information.
Show foundations on schematic plans.
Finalize narrative, prepare preliminary calculations and include information on schematic plans.
Finalize narrative and update schematic plans.
Update narrative and schematic plans.
Provide preliminary calculations verifying major member depths.
Final narrative
N/A
Final narrative
Update narrative and schematic plans, including FSL designation.
Provide preliminary calculations verifying size of forced protection structural elements.
Update narrative and schematic plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative and schematic drawings.
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
86
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Concept narrative to include:
Indoor and outdoor design conditions for all spaces under occupied, 24-hour, and unoccupied
conditions
Ventilation rates, dehumidification, and pressurization criteria for all spaces under occupied,
24-hour, and unoccupied conditions
Equipment capacities, weights, sizes, and power requirements
Description of heating, cooling, ventilating, and dehumidification systems for each major
functional space
Description of heating, cooling, ventilating, and dehumidification control strategies for each air
handling system under occupied, 24-hour, and unoccupied conditions
Fuel and utility requirements
Proposed system showing:
Extent of existing HVAC to be removed if applicable
Identification of spaces for mechanical equipment
Air flow riser diagrams representing supply, return, outside air, and exhaust systems
Water flow riser diagrams of the main mechanical systems
Preliminary building heating and cooling load calculations including U-value calculations, room
and zone inputs and summaries
Preliminary indoor and outdoor design conditions for all spaces under occupied, 24-hour, and
unoccupied conditions
Preliminary ventilation rates, dehumidification, and pressurization criteria for all spaces under
occupied, 24-hour, and unoccupied conditions
Psychrometric calculations for HVAC systems at full load and partial loads. (Partial loads at 50%
and 25%, and unoccupied periods)
Water consumption calculations and analysis including make-up water for HVAC systems
Fuel consumption estimates
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
87
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Evaluation of alternate sources for preheating of domestic water (solar or heat recovery)
Update previous drawings to include:
Systems schematics and flow diagrams
Water Flow Riser diagrams of the main mechanical systems in the mechanical room(s) and
throughout the building
Water consumption calculations and analysis including domestic water and irrigation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
88
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
Preliminary one-line for facility service entrance through to main switchgear/switchboard and
emergency/standby distribution
Further development of stacking, room sizes, equipment loading paths and locations of major
equipment
Approximate service size calculation + generators + onsite generation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
89
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Narrative description of the building's proposed construction features, means of egress system,
water-based fire extinguishing systems, non water-based fire extinguishing systems, smoke
control systems, fire alarm and emergency communication system, fire service access elevators
(if applicable), occupant evacuation elevators (if applicable), etc.
Drawings (Floor Plans) showing:
Equipment spaces for fire protection systems (fire pump, fire command center, etc.)
Fire protection water supplies, fire hydrant locations, fire apparatus access roads, and fire lanes
N/A
Code analysis
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
90
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate- Executive Summary
Supporting Analysis- Basis of estimate, rationale, assumptions, and market analysis as required
in the P-120
Cost Plan Update- GSA Reports 3473, 3474
Cost Estimate- Summary Reports (ASTM UNIFORMAT II and CSI MasterFormat formats as
applicable)
Cost Estimate- Detail line item cost reports
Code Analysis
Cost Estimate- Provide separate estimates for phased work, or bid alternates/options.
Demonstrate that the project is developing on-budget.
VM- List of cost-saving items that would collectively reduce the project cost to approximately
10% below budget
QC Review- Verify that the final concept can be constructed within the project budget.
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
91
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's Design Philosophy regarding Courtroom spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
92
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Sustainability
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative, as design develops-due with each submission)
Report, Narrative, Photographs and Drawings detailing building size, location, materials, design,
condition, and preservation design concepts. See Design Guidelines for detailed information
and more information on requirements.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
93
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Pre-Award Concept
Final Concept
Post-Award Concept
Post-Award Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0 GSA P100 Submittal Matrix (2021) - Version 1.0
Submittal Matrix
DELIVERY METHODS
The submittal matrix is provided to document the baseline submittal
requirements for the four project delivery methods and funding
codes.
Project teams must still provide the standard of care for a fully
constructible set of documents.
This matrix identifies items that GSA requires to validate that the
project is moving forward while meeting the requirements of P100.
Additional submittal requirements may be included in the project
contract.
Design / Build
2
Design / Build / Bridging
3
Construction Manager as
Constructor
4
Design Bid Build
1
CONCEPT PHASE
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
START
END
Final
Concept
(BA 51, 55, 80,
ESPC)
Concept
Development
(BA 51, 55)
Preliminary
Concept
(BA 51, 55)
Offerors Tech
Proposal
(BA 51, 55, 80,
ESPC)
CD Final
(BA 51, 54, 55, 61,
80, ESPC)
CD 95%
(BA 51, 54, 55, 80,
ESPC)
CD 65%
(BA 51, 54, 55, 80,
ESPC)
Design
Development 100%
(BA 51, 54, 55, 61, 80, ESPC)
BA51 New Construction
BA61 Operating Funds for the purpose of repairs and
alterations
BA54 Minor Repair and Alterations BA80 Reimbursable Work Authorization
BA55 Major Repair and Alterations
ESPC Energy Savings Performance Contract including
utility projects
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
95
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative overview of any major accessibility/ABAAS compliance issues for each concept
Provide sketches and additional narrative explaining the key accessibility issues significantly
impacting the concept design (site placement, accessible route challenges, program
requirements significantly impacted such as facility serving a high number of people with
disabilities).
For alterations and renovations projects, provide narrative on accessible path of travel
obligations resulting from changes to primary function areas (ABAAS F202.4). For addition type
projects, describe the additional access modifications required for the existing facility (ABAAS
F202.2). For these alteration and addition requirements, explain the budgetary impact and
affect on the overall scope of the project.
Provide a statement outlining proposed methods to manage the observed and expected
changes in climate, based on the criteria in the statement of work (SOW) and the climate profile
information provided by GSA.
Identify project climate protection levels (CPLs) - outcome-focused, performance-based criteria
that informed the POR and other project criteria/specifications and include a simple phased
adaptation plan.
Include the proposed method of documentation for each project design milestone to track that
the design is able to adapt to changing conditions and include the thresholds to monitor the
asset.
A response template is available for use. The design team may use an alternate format but
must include the content in the GSA template.
Operations and Maintenance (O&M) Narrative for each of the alternatives. Compare and
contrast the O&M benefits, challenges, and estimated LCC of each alternative.
N/A
N/A
Provide list of applicable codes.
Provide the P100 matrix with performance tiers identified.
BIM Execution Plan update
Reality Capture documentation (for an existing building, or historic site, and if required by
scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.)
Source models to coordinate geolocation/geocoding of site and model orientation
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
96
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Short sustainable strategy narrative for each design concept. Include LEED, energy (including
EUI target), water, waste, and guiding principles.
Identify a preliminary LEED certification goal, including level and certification system.
Address LEED achievement plans in the Sustainable Strategy Narrative.
Provide basic information in the Sustainable Strategy Narrative explaining how Energy Net Zero
was considered.
Provide basic information in the Sustainable Strategy Narrative explaining how Water Net Zero
was considered.
N/A
Achieve LEED BD+C silver or better, and consider GSA's 2021 Guiding Principles Checklist.
Mention Guiding Principles compliance plan in Sustainable Strategy Narrative.
Provide initial energy usage intensity (EUI) design target. GSA's Energy Use Target Guidance
can help streamline calculations.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
97
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide short narrative of site's context regarding walkability, proximity to neighborhood
amenities, access to transit, and other pedestrian linkages around and through the site.
Provide graphics and short narrative to describe site's community planning context, with regard
to land use, economic development, urban design, relevant history, etc. and how that context
informs the concept.
Summarize consultation with local officials (to include names of stakeholders consulted,
meeting minutes, and whether the parties consulted appear to represent the array of local
demographics and opinions or whether further outreach to additional groups is needed) and
outline plans for further consultation.
Highlight relative merits or challenges presented by the various concepts.
Provide brief zoning and design guideline analysis of site and surroundings.
Discuss any uncertainties that the proposed concept would align with local requirements.
Note that local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure.
Provide narrative that identifies potential areas inside and outside the building that would be
suitable for shared public use (incl. after hours). Highlight any significant challenges or
opportunities to create such spaces.
Provide a short narrative and preliminary supportive diagrams on each design concept
approach that clearly demonstrates site and landscape approach at a design scale.
Each design has considered SITES and how this will be achieved. Provide basic information on
the components and relationship of the spatial layout strategy.
Each design has considered the overall site water balance and how that will be preserved
and/or enhanced through the various proposals.
Each design has considered the overall vegetation approach and how water required for
irrigation will be harvested from non potable sources.
Each design has considered the surface parking requirements of the project program and
provided a spatial approach that meets specific criteria identified in the P100 Facility Standard.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
98
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
Proposed fenestration systems are appropriate to the climate. Proposed designs are readily
achievable and do not pose unusual risks in terms of constructability, performance, ease of
maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
99
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Approved Program and Adjacencies
General Information
Building and Service Spaces
Design Narrative & Calculations
Three (3) overall building concept designs including drawings, BIM, renderings & photos
Compare net, usable and gross SF of design concepts to program.
N/A
N/A
N/A
Section Continues (next page)
Mechanical rooms and service spaces are of sufficient size and quantity to accommodate all
required equipment; consider maintenance/installation/removal of equipment.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
100
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
All support spaces identified with appropriate adjacencies and reasonable size related to the
program
Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate
maximum occupant load
Show a reasonable vertical profile that will allow for systems integration.
Floor-to-floor heights are sufficient to accommodate any utilities/cabling/above ceiling
requirements
Show a reasonable representation of all of the exterior planes to include materiality and
fenestration; describe the design intent for the enclosure system(s): (barrier wall, cavity wall,
curtain wall, rain screen, etc.).
Overall exterior design is in keeping with specific program requirements by project; exterior is
easy to maintain
N/A
Provide an electronic massing model to give a sense of the design including materiality and
fenestration.
Show that no major obvious deficiencies are present in the design.
Document any deficiencies or waivers required.
Interior and exterior architectural features are code compliant
N/A
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
101
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Prepare narrative that summarizes design loads.
Provide geotechnical report.
Provide minutes from report recommendations discussion with GSA structural engineer.
N/A
Identify any special materials or potential construction methods that are planned or could
potentially be required.
Narrative describing a minimum of three (3) alternatives schemes/materials (including
superstructure and foundations) to be considered
Narrative describing anticipated content of calculations including any special requirements that
involve unusual features of the design or complex analysis methods
N/A
Narrative that identifies historic status and related potential constraints
Narrative summarizing anticipated physical security requirements and standards. Include FSL
information from FSC.
Narrative identifying project site characteristics and civil design challenges
MISCELLANEOUS
COMPONENTS
Chapter 4
Narrative summarizing primary structural and facade attachments to the exterior of the building
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
102
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Describe at least three HVAC Concepts for the proposed designs.
Criteria to be used for Energy Goals
Describe the Tiers to be used in the Mechanical Design.
Identify mechanical spaces.
Develop all base assumptions.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
103
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Description of the water reduction goals
Criteria to be used for Energy Goals (such as solar hot water)
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
104
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Show basic location of mechanical/electrical rooms.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
105
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Design team fire protection engineer must provide a narrative regarding the applicable codes
and standards, and special requirements referenced in P100 that relate to the site and the
proposed occupancy use.
Construction, protection, egress facilities, and occupancy features necessary to minimize
danger to life, property, and mission continuity from the effects of fire, including smoke, heat,
and toxic gases. adherence to all applicable codes and standards, and special requirements
referenced in P100.
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
106
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
107
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
108
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Narrative addressing treatment of historic property on sites acquired for new construction,
visual impact of new construction on adjoining historic property, planned mitigation for affected
archeological resources, treatment of preservation zones in GSA-controlled historic buildings.
Consult Regional Historic Preservation Officer and Building Preservation Plan.
BIM used as required per contract, or as otherwise agreed, to support Section 106 compliance.
These uses may influence earlier phases in laser scanning, photogrammetry,
photo-documentation and the inclusion of this information in the modelling effort.
Assess potential for archeological artifacts before site acquisition and before initiating design
for work requiring ground disturbance on federally controlled property-consult Regional Historic
Preservation Officer regarding 106 compliance requirements.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Preliminary Concept
Project Phase
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Discipline
Concept Design Bridging Set: Preliminary Concept (BA 51, 55)
Page
109
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Concept Design Bridging Set: Concept Development (BA 51, 55)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
110
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative of accessibility strategy addressing accessible routes, toilet rooms, ramps, traffic
conflicts, pedestrian crossings, changes in grade and locations of accessible parking and
drop-offs, signage and main entrance identification and visibility. For any unique/speciality
spaces (courtrooms, assembly, exhibit, etc.), address key access issues including number of
accessible spaces.
Alterations/additions: Describe accessibility barriers technically infeasible (as defined by
ABAAS) to remedy and alternatives to provide access.
Historic Preservation: Identify any ABAAS exceptions, the reasoning for it, and likelihood for
concurrence by the appropriate historic preservation officer or council.
Diagrams and drawings:
Site - Proposed accessible routes for pedestrians from proposed accessible surface parking
locations, drop-off and public transit to front entrance to include locations of ramps, curb cuts
and viewability as applicable
Building - Proposed accessible routes for pedestrians from main entrances and proposed
accessible in-building parking locations, to elevator lobbies, accessible bathrooms and primary
function spaces as applicable.
Highlight areas where accessibility may conflict with other building systems/components. Cite
local codes and restrictions in addition to ABAAS
At each subsequent phase of the design development, if the POR is updated, then update the
statement to reflect relevant findings and changes. Identify strategies and elements in the
drawings and reference in the statement.
Refine the O&M Narrative submission for the chosen alternative from the previous submission.
Submit Operational Excellence Concept Checklist.
Highlight relevant responses to previous submission comments.
N/A
Update the P100 matrix.
BIM Execution Plan update
Source Models
IFC model translations
Modeled spatial validation / calculations
Division 1 Specifications Sections on BIM
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
111
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Narrative detailing the integrated design process, the design's sustainability strategy, and
technologies that are expected to help achieve building performance.
Draft LEED scorecard with expected points, possible points, and points that are unlikely or not
applicable.
Narrative describing type and size of renewable energy generating equipment, if any, planned
for the project
Identify any infrastructure for post-project additional renewable installation, or any plans for
more renewables to be added post-project.
Narrative describing any water net zero strategies
Describe strategy for managing waste in the Sustainable Strategy Narrative.
Identify appropriate space for waste net zero activities in the drawings.
Complete GSA's Guiding Principles Checklist. Ensure project scope meets their requirements to
be on track for compliance.
Develop a Design Performance Model to compare to the design EUI.
Narrative describing daylight, view and glare strategy including initial calculations to meet
Designing for Daylight
N/A
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
112
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide additional detail, as appropriate, to properly evaluate the concept.
Include graphics and narrative to provide additional detail, as appropriate, to properly evaluate
the concept and its ability to align with local planning, design, and development goals.
Provide additional details as appropriate to evaluate the concept.
Provide additional details as appropriate to evaluate the concept.
Extended narrative and supporting diagrams describing the site layout spatial design approach,
including all critical site relationships both architectural and non architectural, site hydrology
and circulation systems, all critical design spot elevations (including adjacent landscape)
finished floor elevations, and all discrete spatial site features being proposed.
Critical areas depicting the landscape should be provided including an illustrative plan, critical
illustrative sections, and critical landscape architectural renderings that depict the design
character and quality of the proposal.
SITES scorecard with expected points, possible points, and points not applicable.
Various approaches to achieve compliance with EISA section 438 and SITES Credit 3.3- for 6
points are identified for the project and site systems are diagrammed.
A separate brief submission is required to demonstrate compliance with EISA section 438. Any
potential project divergence from following the intent of the Federal Law needs to be raised to
the full client team at this time and consultation with Project Management staff and National
Subject Matter experts needs to begin in earnest.
Various approaches to achieve compliance with SITES Credit 3.4 for 5 points are identified for
the project.
Various approaches to achieve compliance with the P100 Facility Standard for Parking Field
design have been explored. Each approach provides a rough order of magnitude assessment
of total parking stalls proposed, impact and relationship to site hydrology and architectural
layout, and a diagram legend with the overall paved surface being proposed relative to the total
parking provided.
All vegetation required for Parking Field design are calculated and located within the Parking
Field as per the design requirement.
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
113
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
Proposed fenestration systems are appropriate to the climate. Proposed designs are readily
achievable and do not pose unusual risks in terms of constructability, performance, ease of
maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance
Proposed enclosure systems are accessible for regular maintenance
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Plans identifying support spaces with appropriate adjacencies and reasonable size related to
the program
Mechanical rooms and service spaces are of sufficient size and quantity to accommodate all
required equipment; consider maintenance/installation/removal of equipment
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
114
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
All major spaces identified with appropriate adjacencies and reasonable size related to the
program by division or areas
Project objectives and scope. Area of work plans.
N/A
Short narrative on each design concept. Include summary sheet of calculations showing all
assumptions, applicable codes and standards referenced, and conclusions.
Calculations should include engineering sketches.
Refinement of selected concept, additional detail in drawings and BIM model
Compare net, usable and gross SF of design concept to program.
N/A
N/A
N/A
Section Continues (next page)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
115
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
N/A
Sections, floor-to-floor, indicating ALL critical dimensions
Floor and Roof Elevations, Labeled
Elevations of major public spaces
Interior design for major public spaces aligns with building architectural requirements
Provide an electronic massing model on a common base, for each design scheme. No
fenestration.
N/A
Identify public vs. private areas, identify paths of travel.
Section Continues (previous page)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
116
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Update narrative.
List design loads on schematic plans.
Narrative addressing alternative foundation approaches including benefits, challenges and
relative costs associated for each approach
Narrative addressing potential vibration issues associated with selected structural scheme
Update narrative.
Provide schematic plans showing location of innovative materials and notes for special
construction methods.
Update narrative identifying strengths and weaknesses of alternatives.
Provide schematic plans showing recommended approach.
Coordinate project calculation package requirements with GSA Structural Engineer.
Update narrative.
N/A
Update narrative.
Update narrative, including FSL designation.
Identify special requirements on schematic plans.
Update narrative.
Provide schematic site plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative.
Provide schematic drawings showing locations.
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
117
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Comparison of the three mechanical systems and equipment for the selected design
Criteria used for Energy Analysis of each of the three systems
Identify how Tier criteria is used in each of the three options
Refined Rough order of Magnitude for each of the three choices
Describe at least three HVAC Concepts for the proposed designs.
Criteria to be used for Energy Goals
Describe the Tiers to be used in the Mechanical Design.
Apply Base Assumptions to each of the 3 mechanical concepts.
Provide a dew point analysis.
Table of contents identifying specifications to be used on the project
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
118
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Domestic cold water
Domestic hot water
Sanitary systems
Storm drainage
Irrigation
Proposed building zoning and major piping runs
Locations of proposed plumbing fixtures and equipment
Rough order of magnitude water consumption calculations
Specifications Table of Contents (TOC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
119
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Stacking, basic room sizes, and locations of major equipment
N/A
N/A
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
120
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
N/A
N/A
N/A
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
121
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
122
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA’s Design Philosophy regarding Courtroom Spaces as laid out in
the U.S. courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
123
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative with each submission) - narrative, photos,
drawings explaining preservation design issues and proposed solutions. See Appendix A for
report outline template
Existing major site utilities
Archeological compliance submittals in accordance with 106 consultation terms for projects
involving ground disturbance - coordinate with RHPO
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Concept Development (BA 51, 55)
Preliminary Concept
Concept Development
Final Concept
Offeror’s Tech Proposal
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
124
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Lead designer's architectural design philosophy is in keeping with GSA's philosophies and
values
Provide a statement of design philosophy and how lead designer expects to collaborate with
artists on this project.
N/A
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
GSA P100 Submittal Matrix (2021) - Version 1.0
Refined narrative of accessibility strategy with diagrams and drawings explaining the key issues
Show primary accessible path of travel to include relevant elements including bathrooms,
drinking fountains, entrance doorways.
Show all required clearances of accessible routes to include widths of corridors, non complying
projections, floor transitions, lighting and clear floor areas at all doors along route.
DB package and deliverables should be tailor to the specifics of the project and DB approach. the
list below is a suggestion of needs:
Design BIM of Final Design Concept demonstrating that the Final Design Concept aligns with
the building program. Final Concept model contains SDM data for all spaces/rooms if bridging
used as proof of spatial design.
Bidding model for procurement purposes / bidding release - model stripped of details that
would prevent transfer of design risk to design-build contractor
IFC File export from Design BIM -record IFC
Concept COBie Spreadsheet - if Bridging used to prove out mechanical performance of design
BIM QC Checklist: Identifies what is currently contained in Design BIM
updated Energy BIM Model files (if required as part of bridging design)
BIM Interoperability Tool Model Check Report validating Model contains all CDX attributes and
appropriate design data : helpful if model is transferred to DB team for use.
Final 3D Design Coordination Report
Final Division 1 Specifications Sections on BIM
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
125
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Provide finalized Concept statement. If the POR is updated, then update the statement to
reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Final Concept O&M Narrative, Operational Excellence Checklist submission.
Narrative discussing plans for exterior operations and maintenance (window washing,
relamping, etc.)
Highlight relevant responses to previous submission comments.
Provide a list of any outstanding substantive comments that have not been resolved.
Provide narrative statement that the proposed design will comply with the applicable codes.
Provide assessment of any hazardous materials.
Updated P100 matrix with statement that the proposed design will comply with P100 and the
performance tiers
List any approved waivers.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
126
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Clearly identify sustainable design strategies on the drawings.
Updated LEED scorecard showing enough points expected to meet contractual requirement
Finalized description of renewables planned for the project
Identify location and amount of any renewable equipment planned for post-project addition.
Finalized water strategy, and clear designation of components within the drawings
Finalized waste strategy, and clear designation of components within the drawings
Update Guiding Principles Checklist if/as appropriate.
Develop Building Energy Model to compare to the design EUI.
Energy consumption calculations and analysis
Finalize narrative and calculations showing compliance with Designing for Daylight.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
127
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide final analysis of the concept's status with regard to P100 sustainable location standards,
including transit access and walkability.
Provide final narrative on site's relation to local planning context and how the proposed design
responds to local goals.
Highlight any outstanding uncertainties or opportunities that require further consultation or
analysis.
Per P100, local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure; the concept package must clarify any
relevant areas that have not yet resolved relevant issues.
Provide final zoning analysis. Describe status of local review and comment.
Provide additional details as appropriate to evaluate the concept.
For relevant interior assembly or other spaces, denote design strategy and estimated
occupancy capacities for various uses.
For exterior spaces, describe design strategy to support both passive and programmed uses,
including estimated site seating capacities.
All site strategies are clearly shown and identified within the drawings and further developed
from the second peer review stage with all peer review commentary responded to.
Update SITES scorecard showing enough points achievable to meet contracted requirement
and all possible points that require owner operational commitments are identified.
Narrative and drawing material required to achieve the preferred approach for SITES Credit 3.3-
for 6 points are prepared and submitted
Draft materials required to achieve the preferred approach for SITES Credit 3.4 for 5 points
Narrative and drawings with requisite calculations, including permeable and impermeable area,
number of parking stalls, number of trees required and proposed, and sustainable features
such as biofiltration areas, level spreaders, infiltration chambers, etc.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
128
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Draft PRELIMINARY Building Enclosure Commissioning (BECx) Plan.
Identify any testing required to address risk inherent in the design intent.
Describe mockup type(s) required to develop consensus for the design intent and/or prove
system performance.
Describe quantity, type(s), size(s), and complexity of required mock-ups.
Describe roofing type(s). Indicate roof slopes and drain locations.
Indicate type and extents of fall protection.
Indicate means of safe suspended access.
Establish requirements for air barriers.
Establish requirements for thermal barriers.
Establish requirements for fenestration types.
Establish requirements for below-grade waterproofing.
Establish requirements for fall protection and safe suspended access.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
129
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Drawings should include at a minimum: entrances, lobbies, corridors, stairways, elevators, work
areas, special spaces, mechanical rooms for major equipment and air handlers, and service
spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated.
Building elevations and sections labeling most important spaces and showing floor-to-floor
heights and other critical dimensions and elevations.
N/A
Floorplans of mechanical rooms for major equipment and air handlers
Floorplans of all service spaces, including mailrooms and loading dock/access
Extended narrative and further developed calculations. Calculations must refer to code,
paragraph of code used, standards, and text books used for specific portion of calculation.
Further refinement of selected concept. Floor plans, elevations showing fenestration, exterior
materials, cast shadows.
Interior elevations of major spaces, building sections showing adequate space for all systems
Color renderings, physical model to convey the architectural intent of the design
Compare net, usable and gross SF of design concepts to program.
Description of interior finish materials, with detailed explanation for public spaces
Identify millwork locations on plan.
Show proposed furniture locations on plan. Indicate ALL critical dimensions for ABAAS and
egress.
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
130
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
Floorplan showing open office and enclosed office area/layout & typical workstation design
intent
Office areas comply with GSA’s Space Utilization Benchmark and that the integration between
the approved program and the building concept is achievable (this is also dependent on the
tenant)
Interior conditions (noise, temperature, etc.) will contribute to occupant comfort at maximum
occupant load levels
Identify areas that require acoustical solutions. Provide acoustical solution concepts, i.e., sound
masking, ceiling treatments, and wall treatments.
Toilet fixture count analysis
N/A
Elevations of major building facades; List of exterior materials proposed (provide samples upon
request)
Color renderings showing major public spaces (as defined by PM at the start of the project)
from different vantage points
Electronic model of final concept
Code analysis
N/A
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
131
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Finalize narrative and update schematic plans.
Finalize narrative with recommended preferred foundation approach with supporting
information.
Show foundations on schematic plans.
Finalize narrative, prepare preliminary calculations and include information on schematic plans.
Finalize narrative and update schematic plans.
Update narrative and schematic plans.
Provide preliminary calculations verifying major member depths.
Final narrative
N/A
Final narrative
Update narrative and schematic plans, including FSL designation.
Provide preliminary calculations verifying size of forced protection structural elements.
Update narrative and schematic plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative and schematic drawings.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
132
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Concept narrative to include:
Indoor and outdoor design conditions for all spaces under occupied, 24-hour, and unoccupied
conditions
Ventilation rates, dehumidification, and pressurization criteria for all spaces under occupied,
24-hour, and unoccupied conditions
Equipment capacities, weights, sizes, and power requirements
Description of heating, cooling, ventilating, and dehumidification systems for each major
functional space
Description of heating, cooling, ventilating, and dehumidification control strategies for each air
handling system under occupied, 24-hour, and unoccupied conditions
Fuel and utility requirements
Proposed system showing:
Extent of existing HVAC to be removed if applicable
Identification of spaces for mechanical equipment
Air flow riser diagrams representing supply, return, outside air, and exhaust systems
Water flow riser diagrams of the main mechanical systems
Preliminary building heating and cooling load calculations including U-value calculations, room
and zone inputs and summaries-
Preliminary indoor and outdoor design conditions for all spaces under occupied, 24-hour, and
unoccupied conditions
Preliminary ventilation rates, dehumidification, and pressurization criteria for all spaces under
occupied, 24-hour, and unoccupied conditions
Psychrometric calculations for HVAC systems at full load and partial loads. (Partial loads at 50%
and 25%, and unoccupied periods)
Water consumption calculations and analysis including make-up water for HVAC systems
Fuel consumption estimates
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
133
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Evaluation of alternate sources for preheating of domestic water (solar or heat recovery)
Update previous drawings to include:
Systems schematics and flow diagrams
Water Flow Riser diagrams of the main mechanical systems in the mechanical room(s) and
throughout the building
Water consumption calculations and analysis including domestic water and irrigation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
134
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
Preliminary one-line for facility service entrance through to main switchgear/switchboard and
emergency/standby distribution
Further development of stacking, room sizes, equipment loading paths and locations of major
equipment
Approximate service size calculation + generators + onsite generation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
135
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Narrative description of the building's proposed construction features, means of egress system,
water-based fire extinguishing systems, non water-based fire extinguishing systems, smoke
control systems, fire alarm and emergency communication system, fire service access elevators
(if applicable), occupant evacuation elevators (if applicable), etc.
Drawings Floor plans showing:
Equipment spaces for fire protection systems (fire pump, fire command center, etc.)
Fire protection water supplies, fire hydrant locations, fire apparatus access roads, and fire lanes
N/A
Code analysis
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
136
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate- Executive Summary
Supporting Analysis- Basis of estimate, rationale, assumptions, and market analysis as required
in the P-120
Cost Plan Update- GSA Reports 3473, 3474
Cost Estimate- Summary Reports (ASTM UNIFORMAT II and CSI MasterFormat formats as
applicable)
Cost Estimate- Detail line item cost reports
Cost Estimate- Detail line item cost reports
Cost Estimate- Provide separate estimates for phased work, or bid alternates/options
Demonstrate that the project is developing on-budget
VM- List of cost-saving items that would collectively reduce the project cost to approximately
10% below budget
Verify that the final concept can be constructed within the project budget
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
137
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's Design Philosophy regarding Courtroom Spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
138
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative, as design develops-due with each submission)
Report, Narrative, Photographs and Drawings detailing building size, location, materials, design,
condition, and preservation design concepts.
See Design Guidelines for detailed information and more information on requirements.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Concept Design Bridging Set: Final Concept (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offeror’s Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
139
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
140
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Refined narrative of accessibility strategy with diagrams and drawings explaining the key issues
Show primary accessible path of travel to include relevant elements including bathrooms,
drinking fountains, entrance doorways.
Show all required clearances of accessible routes to include widths of corridors, non complying
projections, floor transitions, lighting and clear floor areas at all doors along route.
Submit revised statement to reflect the relevant findings and changes explicitly noting the
climate readiness elements that are included and excluded in the proposal.
If the POR is updated, then update the statement to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Final Concept O&M Narrative, Operational Excellence Checklist submission.
Narrative discussing plans for exterior operations and maintenance (window washing,
relamping, etc.)
Highlight relevant responses to previous submission comments.
Provide a list of any outstanding substantive comments that have not been resolved.
Provide narrative statement that the proposed design will comply with the applicable codes.
Safety narrative including hazardous materials, fall protection, and arc flash requirements.
Updated P100 matrix with statement that the proposed design will comply with P100 and the
performance tiers
List any approved waivers.
DB package and deliverables should be tailor to the specifics of the project and DB approach. the
list below is a suggestion of needs:
Design BIM of Final Design Concept demonstrating that the Final Design Concept aligns with
the building program. Final Concept model contains SDM data for all spaces/rooms if bridging
used as proof of spatial design.
Bidding model for procurement purposes / bidding release - model stripped of details that
would prevent transfer of design risk to design-build contractor
IFC File export from Design BIM -record IFC
Concept COBie Spreadsheet - if Bridging used to prove out mechanical performance of design
BIM QC Checklist: Identifies what is currently contained in Design BIM
updated Energy BIM Model files (if required as part of bridging design)
BIM Interoperability Tool Model Check Report validating Model contains all CDX attributes and
appropriate design data : helpful if model is transferred to DB team for use.
Final 3D Design Coordination Report
Final Division 1 Specifications Sections on BIM
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
141
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Clearly identify sustainable design strategies on the drawings.
Updated LEED scorecard showing enough points expected to meet contractual requirement
Finalized description of renewables planned for the project
Identify location and amount of any renewable equipment planned for post-project addition.
Finalized description of renewables planned for the project.
Identify location and amount of any renewable equipment planned for post-project addition.
Finalized waste strategy, and clear designation of components within the drawings.
Update Guiding Principles Checklist if/as appropriate.
Develop Building Energy Model to compare to the design EUI.
Energy consumption calculations and analysis
Finalize narrative and calculations showing compliance with Designing for Daylight
Provide detailed LCC for equipment that use energy or water
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
142
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide final analysis of the concept's status with regard to P100 sustainable location standards,
incl. transit access and walkability.
Provide final zoning analysis. Describe status of local review and comment.
Provide additional details as appropriate to evaluate the concept.
For relevant interior assembly or other spaces, denote design strategy and estimated
occupancy capacities for various uses.
For exterior spaces, describe design strategy to support both passive and programmed uses,
including estimated site seating capacities.
All site strategies are clearly shown and identified within the drawings and further developed
from the second peer review stage with all peer review commentary responded to.
Update SITES scorecard showing enough points achievable to meet contracted requirement
and all possible points that require owner operational commitments are identified.
Narrative and drawing material required to achieve the preferred approach for SITES Credit 3.3-
for 6 points are prepared and submitted.
Draft materials required to achieve the preferred approach for SITES Credit 3.4 for 5 points..
Narrative and drawings with requisite calculations, including permeable and impermeable area,
number of parking stalls, number of trees required and proposed, and sustainable features
such as biofiltration areas, level spreaders, infiltration chambers, etc.
COLLABORATIVE
DESIGN PROCESS
Chapter 2
Provide final narrative on site's relation to local planning context and how the proposed design
responds to local goals.
Highlight any outstanding uncertainties or opportunities that require further consultation or
analysis.
Per P100, local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure; the concept package must clarify any
relevant areas that have not yet resolved relevant issues.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
143
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Propose collaborative approach to developing the Building Enclosure Commissioning (BECx)
Plan.
Propose quantity, type(s), size(s), and complexity of mock-ups.
Propose roofing type(s). Indicate roof slopes and drain locations.
Indicate type and extents of fall protection. Indicate means of safe suspended access.
Propose air barriers type(s).
Propose thermal barrier type(s).
Propose fenestration type(s).
Propose below-grade waterproofing.
Propose fall protection and safe suspended access.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
144
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Continued development of selected concept.
Include demolition plans, floor plans showing: Work areas, lobbies, corridors, entrances,
stairways, elevators, special spaces, and service spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated. Office areas
must show proposed layouts down to the office level of detail.
Verify the integration between the approved program and the building concept is achievable, in
tabular form, including net, usable and gross SF
N/A
Drawing and narrative indicating plan for accessing and maintaining equipment, including
clearance requirements for maintenance, operation, and removal
indicate distance and travel path from/to freight elevators and loading dock; include size &
weight of equipment.
Floorplans of all service spaces, including mailrooms loading dock
Provide analysis of loading dock in narrative format, along with any pertinent calculations.
Further refinement of narrative and calculations
Including acoustical calculations for envelope, interior walls/floors/ceilings, mechanical and
electrical equipment. Heat transfer in building envelope, toilet fixture count,
illumination/daylighting/glare, elevator analysis, loading dock analysis.
Further refinement of selected concept
Floor plans, elevations showing fenestration, exterior materials, cast shadows
Interior elevations of major spaces, building sections showing adequate space for all systems
Color renderings, physical model to convey the architectural intent of the design
Compare net, usable and gross SF of design concepts to program.
Description of interior finish materials, with detailed explanation for public spaces
Identify millwork locations on plan.
Show proposed furniture locations on plan. Indicate ALL critical dimensions for ABAAS and
egress.
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
145
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
Floorplan showing open office and enclosed office area/layout & typical workstation design
intent
Office areas comply with GSA's Space Utilization Benchmark and that the integration between
the approved program and the building concept is achievable (this is also dependent on the
tenant)
Interior conditions (noise, temperature, etc.) will contribute to occupant comfort at maximum
occupant load levels
Identify areas that require acoustical solutions. Provide acoustical solution concepts, i.e., sound
masking, ceiling treatments, and wall treatments.
Toilet fixture count analysis
Sections, floor-to-floor, indicating ALL critical dimensions
Elevations of major building facades; List of exterior materials proposed (provide samples upon
request)
Color renderings showing major public spaces (as defined by PM at the start of the project)
from different vantage points
Electronic model of final concept
Code analysis
N/A
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
146
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Finalize narrative and update schematic plans.
Finalize narrative with recommended preferred foundation approach with supporting
information. Show foundations on schematic plans.
Finalize narrative, prepare preliminary calculations and include information on schematic plans.
Finalize narrative and update schematic plans.
Update narrative and schematic plans. Provide preliminary calculations verifying major member
depths.
Final narrative
N/A
Final narrative
Update narrative and schematic plans. Provide preliminary calculations verifying size of forced
protection structural elements.
Update narrative and schematic plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative and schematic drawings.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
147
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Concept narrative to include:
Indoor and outdoor design conditions for all spaces under occupied, 24-hour, and unoccupied
conditions
Ventilation rates, dehumidification, and pressurization criteria for all spaces under occupied,
24-hour, and unoccupied conditions
Equipment capacities, weights, sizes, and power requirements
Description of heating, cooling, ventilating, and dehumidification systems for each major
functional space
Description of heating, cooling, ventilating, and dehumidification control strategies for each air
handling system under occupied, 24-hour, and unoccupied conditions
Fuel and utility requirements
Proposed system showing:
Extent of existing HVAC to be removed if applicable
Identification of spaces for mechanical equipment
Air flow riser diagrams representing supply, return, outside air, and exhaust systems
Water flow riser diagrams of the main mechanical systems
Preliminary building heating and cooling load calculations including U-value calculations, room
and zone inputs and summaries-
Preliminary indoor and outdoor design conditions for all spaces under occupied, 24-hour, and
unoccupied conditions
Preliminary ventilation rates, dehumidification, and pressurization criteria for all spaces under
occupied, 24-hour, and unoccupied conditions
Psychrometric calculations for HVAC systems at full load and partial loads. (Partial loads at 50%
and 25%, and unoccupied periods)
Water consumption calculations and analysis including make-up water for HVAC systems
Fuel consumption estimates
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
148
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Evaluation of alternate sources for preheating of domestic water (solar or heat recovery)
Update previous drawings to include:
Systems schematics and flow diagrams
Water Flow Riser diagrams of the main mechanical systems in the mechanical room(s) and
throughout the building
Water consumption calculations and analysis including domestic water and irrigation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
149
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
Preliminary one-line for facility service entrance through to main switchgear/switchboard and
emergency/standby distribution
Further development of stacking, room sizes, equipment loading paths and locations of major
equipment
Approximate service size calculation + generators + onsite generation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
150
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Narrative description of the building's proposed:
Construction features
Means of egress system
Water-based fire extinguishing systems
Non water-based fire extinguishing systems
Smoke control systems
Fire alarm and emergency communication system
Fire service access elevators (if applicable)
Occupant evacuation elevators (if applicable), etc.
Drawings Floor plans showing:
Equipment spaces for fire protection systems (fire pump, fire command center, etc.)
Fire protection water supplies, fire hydrant locations, fire apparatus access roads, and fire lanes
N/A
Code Analysis
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
151
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate- Executive Summary
Supporting Analysis- Basis of estimate, rationale, assumptions, and market analysis as required
in the P-120.
Cost Plan Update - GSA Reports 3473, 3474
Cost Estimate- Summary Reports (ASTM UNIFORMAT II and CSI MasterFormat formats as
applicable)
Cost Estimate - Detail line item cost reports
Code Analysis
Cost Estimate - Provide separate estimates for phased work, or bid alternates/options.
Demonstrate that the project is developing on-budget.
VM- List of cost-saving items that would collectively reduce the project cost to approximately
10% below budget
QC Review - Verify that the final concept can be constructed within the project budget.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
152
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's Design Philosophy regarding Courtroom Spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
153
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative, as design develops-due with each submission)
Report, Narrative, Photographs and Drawings detailing building size, location, materials, design,
condition, and preservation design concepts
See Design Guidelines for detailed information and more information on requirements.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Best and Final: Offerors Technical Proposal (BA 51, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Development
Final Concept
Offerors Tech Proposal
Preliminary Concept
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
154
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0 GSA P100 Submittal Matrix (2021) - Version 1.0
Submittal Matrix
DELIVERY METHODS
The submittal matrix is provided to document the baseline submittal
requirements for the four project delivery methods and funding
codes.
Project teams must still provide the standard of care for a fully
constructible set of documents.
This matrix identifies items that GSA requires to validate that the
project is moving forward while meeting the requirements of P100.
Additional submittal requirements may be included in the project
contract.
Design / Build
2
Design / Build / Bridging
3
Construction Manager as
Constructor
4
Design / Bid / Build
1
CONCEPT PHASE
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
START
END
Final
Concept
(BA 51, 55, 80,
ESPC)
Concept
Development
(BA 51, 55)
Preliminary
Concept
(BA 51, 55)
CD Final
(BA 51, 54, 55, 61,
80, ESPC)
CD 95%
(BA 51, 54, 55, 80,
ESPC)
CD 65%
(BA 51, 54, 55, 80,
ESPC)
Design
Development 100%
(BA 51, 54, 55, 61, 80, ESPC)
BA51 New Construction
BA61 Operating Funds for the purpose of repairs and
alterations
BA54 Minor Repair and Alterations BA80 Reimbursable Work Authorization
BA55 Major Repair and Alterations
ESPC Energy Savings Performance Contract including
utility projects
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
156
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative overview of any major accessibility/ABAAS compliance issues for each concept
Provide sketches and additional narrative explaining the key accessibility issues significantly
impacting the concept design (site placement, accessible route challenges, program
requirements significantly impacted such as facility serving a high number of people with
disabilities).
For alterations and renovations projects, provide narrative on accessible path of travel
obligations resulting from changes to primary function areas (ABAAS F202.4).
For addition type projects, describe the additional access modifications required for the
existing facility (ABAAS F202.2).
For these alteration and addition requirements, explain the budgetary impact and affect on the
overall scope of the project.
Provide a statement outlining proposed methods to manage the observed and expected
changes in climate, based on the criteria in the statement of work (SOW) and the climate profile
information provided by GSA.
Identify project climate protection levels (CPLs) - outcome-focused, performance-based criteria
that informed the POR and other project criteria/specifications and include a simple phased
adaptation plan.
Include the proposed method of documentation for each project design milestone to track that
the design is able to adapt to changing conditions and include the thresholds to monitor the
asset. A response template is available for use.
The design team may use an alternate format but must include the content in the GSA
template.
Operations and Maintenance (O&M) Narrative for each of the alternatives. Compare and
contrast the O&M benefits, challenges, and estimated LCC of each alternative.
N/A
N/A
Provide list of applicable codes
Provide the P100 matrix with performance tiers identified
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Reality Capture documentation (for an existing building, or historic site, and if required by
scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.)
Source models to coordinate geolocation/geocoding of site and model orientation
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
157
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Short sustainable strategy narrative for each design concept. Include LEED, energy (including
EUI target), water, waste, and guiding principles.
Identify a preliminary LEED certification goal, including level and certification system.
Address LEED achievement plans in the Sustainable Strategy Narrative.
Provide basic information in the Sustainable Strategy Narrative explaining how Energy Net Zero
was considered.
Provide basic information in the Sustainable Strategy Narrative explaining how Water Net Zero
was considered.
N/A
Achieve LEED BD+C silver or better, and consider GSA's 2021 Guiding Principles Checklist.
Mention Guiding Principles compliance plan in Sustainable Strategy Narrative.
Provide initial energy usage intensity (EUI) design target. GSA's Energy Use Target Guidance
can help streamline calculations.
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
158
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide short narrative of site's context regarding walkability, proximity to neighborhood
amenities, access to transit, and other pedestrian linkages around and through the site.
Provide graphics and short narrative to describe site's community planning context, with regard
to land use, economic development, urban design, relevant history, etc. and how that context
informs the concept.
Summarize consultation with local officials (to include names of stakeholders consulted,
meeting minutes, and whether the parties consulted appear to represent the array of local
demographics and opinions or whether further outreach to additional groups is needed) and
outline plans for further consultation.
Highlight relative merits or challenges presented by the various concepts.
Provide brief zoning and design guideline analysis of site and surroundings.
Discuss any uncertainties that the proposed concept would align with local requirements.
Note that local regulations must be followed without exception in the design of systems that
have a direct impact on off-site terrain or infrastructure.
Provide narrative that identifies potential areas inside and outside the building that would be
suitable for shared public use (incl. after hours).
Highlight any significant challenges or opportunities to create such spaces.
Provide a short narrative and preliminary supportive diagrams on each design concept
approach that clearly demonstrates site and landscape approach at a design scale.
Each design has considered SITES and how this will be achieved.
Provide basic information on the components and relationship of the spatial layout strategy.
Each design has considered the overall site water balance and how that will be preserved
and/or enhanced through the various proposals.
Each design has considered the overall vegetation approach and how water required for
irrigation will be harvested from non potable sources.
Each design has considered the surface parking requirements of the project program and
provided a spatial approach that meets specific criteria identified in the P100 Facility Standard.
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
159
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
Proposed fenestration systems are appropriate to the climate.
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
160
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
All major spaces identified with appropriate adjacencies and reasonable size related to the
program by division or areas
Project objectives and scope. Area of work plans.
Plans identifying support spaces with appropriate adjacencies and reasonable size related to
the program
Mechanical rooms and service spaces are of sufficient size and quantity to accommodate all
required equipment; consider maintenance/installation/removal of equipment.
N/A
Short narrative on each design concept. Include summary sheet of calculations showing all
assumptions, applicable codes and standards referenced, and conclusions.
Calculations should include engineering sketches.
Three (3) overall building concept designs including drawings, BIM, renderings & photos
Compare net, usable and gross SF of design concepts to program.
N/A
N/A
N/A
Sustainability
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
161
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
All support spaces identified with appropriate adjacencies and reasonable size related to the
program
Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate
maximum occupant load
Show a reasonable vertical profile that will allow for systems integration.
Floor-to-floor heights are sufficient to accommodate any utilities/cabling/above ceiling
requirements
Show a reasonable representation of all of the exterior planes to include materiality and
fenestration; describe the design intent for the enclosure system(s): (barrier wall, cavity wall,
curtain wall, rain screen, etc.).
Overall exterior design is in keeping with specific program requirements by project; exterior is
easy to maintain
N/A
Provide an electronic massing model to give a sense of the design including materiality and
fenestration.
Show that no major obvious deficiencies are present in the design.
Document any deficiencies or waivers required.
Interior and exterior architectural features are code compliant
N/A
Sustainability
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
162
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Prepare narrative that summarizes design loads.
Provide geotechnical report.
Provide minutes from report recommendations discussion with GSA structural engineer.
N/A
Identify any special materials or potential construction methods that are planned or could
potentially be required.
Narrative describing a minimum of 3 alternatives schemes/materials (including superstructure
and foundations) to be considered
Narrative describing anticipated content of calculations including any special requirements that
involve unusual features of the design or complex analysis methods
N/A
Narrative that identifies historic status and related potential constraints
Narrative summarizing anticipated physical security requirements and standards
Include FSL information from FSC.
Narrative identifying project site characteristics and civil design challenges
MISCELLANEOUS
COMPONENTS
Chapter 4
Narrative summarizing primary structural and facade attachments to the exterior of the building
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
163
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Describe at least three HVAC Concepts for the proposed designs.
Criteria to be used for Energy Goals
Describe the Tiers to be used in the Mechanical Design.
Identify mechanical spaces.
Develop all base assumptions.
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
164
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Description of the water reduction goals
Criteria to be used for Energy Goals (such as solar hot water)
N/A
N/A
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
165
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Show basic location of mech/elec rooms
N/A
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
166
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Design team fire protection engineer must provide a narrative regarding the applicable codes
and standards, and special requirements referenced in P100 that relate to the site and the
proposed occupancy use.
Construction, protection, egress facilities, and occupancy features necessary to minimize
danger to life, property, and mission continuity from the effects of fire, including smoke, heat,
and toxic gases. adherence to all applicable codes and standards, and special requirements
referenced in P100.
N/A
N/A
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
167
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
168
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
169
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Narrative addressing:
Treatment of historic property on sites acquired for new construction
Visual impact of new construction on adjoining historic property
Planned mitigation for affected archeological resources
Treatment of preservation zones in GSA-controlled historic buildings.
Consult Regional Historic Preservation Officer and Building Preservation Plan.
N/A
Assess potential for archeological artifacts before site acquisition and before initiating design
for work requiring ground disturbance on federally controlled property-consult Regional Historic
Preservation Officer regarding 106 compliance requirements.
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Page
170
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Preliminary Concept / First Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
Sustainability
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
171
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Narrative of accessibility strategy addressing accessible routes, toilet rooms, ramps, traffic
conflicts, pedestrian crossings, changes in grade and locations of accessible parking and
drop-offs, signage and main entrance identification and visibility
For any unique/speciality spaces (courtrooms, assembly, exhibit, etc.), address key access
issues including number of accessible spaces.
Alterations/additions: Describe accessibility barriers technically infeasible (as defined by
ABAAS) to remedy and alternatives to provide access.
Historic Preservation: Identify any ABAAS exceptions, the reasoning for it, and likelihood for
concurrence by the appropriate historic preservation officer or council.
Diagrams and drawings:
Site - Proposed accessible routes for pedestrians from proposed accessible surface
parking locations, drop-off and public transit to front entrance to include locations of
ramps, curb cuts and viewability as applicable
Building - Proposed accessible routes for pedestrians from main entrances and proposed
accessible in-building parking locations, to elevator lobbies, accessible bathrooms and
primary function spaces as applicable
Highlight areas where accessibility may conflict with other building systems/components. Cite
local codes and restrictions in addition to ABAAS.
At each subsequent phase of the design development, if the POR is updated, then update the
statement to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Refine the O&M Narrative submission for the chosen alternative from the previous submission.
Submit Operational Excellence Concept Checklist.
Highlight relevant responses to previous submission comments.
N/A
Update the P100 matrix.
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Reality Capture documentation (for an existing building, or historic site, and if required by
scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.)
Source models to coordinate geolocation/geocoding of site and model orientation
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
172
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Narrative detailing the integrated design process, the design's sustainability strategy, and
technologies that are expected to help achieve building performance
Draft LEED scorecard with expected points, possible points, and points that are unlikely or not
applicable.
Narrative describing type and size of renewable energy generating equipment, if any, planned
for the project
Identify any infrastructure for post-project additional renewable installation, or any plans for
more renewables to be added post-project.
Narrative describing any water net zero strategies
Describe strategy for managing waste in the Sustainable Strategy Narrative.
Identify appropriate space for waste net zero activities in the drawings
Complete GSA's Guiding Principles Checklist. Ensure project scope meets their requirements to
be on track for compliance.
Develop a Design Performance Model to compare to the design EUI.
Narrative describing daylight, view and glare strategy including initial calculations to meet
Designing for Daylight
Provide initial LCC for equipment that use energy or water.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
173
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide additional detail, as appropriate, to properly evaluate the concept.
Include graphics and narrative to provide additional detail, as appropriate, to properly evaluate
the concept and its ability to align with local planning, design, and development goals.
Provide additional details as appropriate to evaluate the concept.
Provide additional details as appropriate to evaluate the concept.
Extended narrative and supporting diagrams describing the site layout spatial design approach,
including all critical site relationships both architectural and non architectural, site hydrology
and circulation systems, all critical design spot elevations (including adjacent landscape)
finished floor elevations, and all discrete spatial site features being proposed.
Critical areas depicting the landscape should be provided including an illustrative plan, critical
illustrative sections, and critical landscape architectural renderings that depict the design
character and quality of the proposal.
SITES scorecard with expected points, possible points, and points not applicable
Various approaches to achieve compliance with EISA section 438 and SITES Credit 3.3- for 6
points are identified for the project and site systems are diagrammed
A separate brief submission is required to demonstrate compliance with EISA section 438. Any
potential project divergence from following the intent of the Federal Law needs to be raised to
the full client team at this time and consultation with Project Management staff and National
Subject Matter experts needs to begin in earnest.
Various approaches to achieve compliance with SITES Credit 3.4 for 5 points are identified for
the project
Various approaches to achieve compliance with the P100 Facility Standard for Parking Field
design have been explored. Each approach provides a rough order of magnitude assessment
of total parking stalls proposed, impact and relationship to site hydrology and architectural
layout, and a diagram legend with the overall paved surface being proposed relative to the total
parking provided.
All vegetation required for Parking Field design are calculated and located within the Parking
Field as per the design requirement.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
174
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
N/A
Proposed roofing and roof drainage systems function without extraordinary means and do not
pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle
durability.
List any unique environmental/climate conditions that may impact proposed system.
N/A
Proposed insulation types and considerations
Proposed fenestration systems are appropriate to the climate.
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance.
Proposed enclosure systems are accessible for regular maintenance.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
175
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Drawings should include at a minimum: entrances, lobbies, corridors, stairways, elevators, work
areas, special spaces, mechanical rooms for major equipment and air handlers, and service
spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated.
Building elevations and sections labeling most important spaces and showing floor-to-floor
heights and other critical dimensions and elevations.
N/A
Floorplans of mechanical rooms for major equipment and air handlers
Floorplans of all service spaces, including mailrooms and loading dock/access
Extended narrative and further developed calculations. Calculations must refer to code,
paragraph of code used, standards, and text books used for specific portion of calculation.
Refinement of selected concept, additional detail in drawings and BIM model
Compare net, usable and gross SF of design concept to program.
N/A
N/A
N/A
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
176
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
N/A
Sections, floor-to-floor, indicating ALL critical dimensions
Floor and Roof Elevations, Labeled
Elevations of major public spaces
Provide an electronic massing model on a common base, for each design scheme. No
fenestration.
N/A
Identify public vs. private areas, identify paths of travel.
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
177
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Update narrative.
List design loads on schematic plans.
Narrative addressing alternative foundation approaches including benefits, challenges and
relative costs associated for each approach
Narrative addressing potential vibration issues associated with selected structural scheme
Update narrative.
Provide schematic plans showing location of innovative materials and notes for special
construction methods.
Update narrative identifying strengths and weaknesses of alternatives.
Provide schematic plans showing recommended approach.
Coordinate project calculation package requirements with GSA Structural Engineer.
Update narrative.
N/A
Update narrative.
Update narrative, including FSL designation.
Identify special requirements on schematic plans.
Update narrative.
Provide schematic site plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative.
Provide schematic drawings showing locations.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
178
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Comparison of the three mechanical systems and equipment for the selected design
Criteria used for Energy Analysis of each of the three systems
Identify how Tier criteria is used in each of the three options
Refined Rough order of Magnitude for each of the three choices
Major mechanical equipment layed out in the mechanical spaces for each of the three concepts
Preliminary Equipment Schedules
Apply Base Assumptions to each of the three (3) mechanical concepts.
Provide a dew point analysis.
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
179
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Domestic cold water
Domestic hot water
Sanitary systems
Storm drainage
Irrigation
Proposed building zoning and major piping runs
Locations of proposed plumbing fixtures and equipment
Rough order of magnitude water consumption calculations
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
180
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
N/A
Basis of design
Stacking, basic room sizes, and locations of major equipment
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
181
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
182
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details
Cost Plan
QC Review A-E Estimate
N/A
N/A
N/A
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
183
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's Design Philosophy regarding Courtroom Spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
184
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative with each submission) - narrative, photos,
drawings explaining preservation design issues and proposed solutions. See Appendix A for
report outline template.
Existing major site utilities
Archeological compliance submittals in accordance with 106 consultation terms for projects
involving ground disturbance - coordinate with RHPO
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Preliminary Concept
Concept Development
Final Concept
Concept Design: Concept Development / Second Design Review (BA 51, 55)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
185
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Lead designer's architectural design philosophy is in keeping with GSA's philosophies and
values
Provide a statement of design philosophy and how lead designer expects to collaborate with
artists on this project.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
186
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Refined narrative of accessibility strategy with diagrams and drawings explaining the key issues
Show primary accessible path of travel to include relevant elements including bathrooms,
drinking fountains, entrance doorways.
Show all required clearances of accessible routes to include widths of corridors, non complying
projections, floor transitions, lighting and clear floor areas at all doors along route.
Provide finalized Concept statement. If the POR is updated, then update the statement to
reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Final Concept O&M Narrative, Operational Excellence Checklist submission.
Narrative discussing plans for exterior operations and maintenance (window washing,
relamping, etc.)
Highlight relevant responses to previous submission comments.
Provide a list of any outstanding substantive comments that have not been resolved.
Provide narrative statement that the proposed design will comply with the applicable codes.
Safety narrative including hazardous materials, fall protection, and arc flash requirements.
Updated P100 matrix with statement that the proposed design will comply with P100 and the
performance tiers.
List any approved waivers.
Design BIM of Final Design Concept demonstrating that the Final Design Concept aligns with
the building program. Final Concept model contains all SDM data for all spaces/rooms.
IFC File export from Design BIM
BIM Execution, COBie-Playbook & GSA-CDX information plan updated- Initial COBie
Spreadsheet
BIM QC Checklist: Identifies what is currently contained in Design BIM
Conceptual Energy BIM Model files (if required)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
187
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Clearly identify sustainable design strategies on the drawings.
Updated LEED scorecard showing enough points expected to meet contractual requirement
Finalized description of renewables planned for the project
Identify location and amount of any renewable equipment planned for post-project addition.
Finalized water strategy, and clear designation of components within the drawings
Finalized waste strategy, and clear designation of components within the drawings
Update Guiding Principles Checklist if/as appropriate.
Develop Building Energy Model to compare to the design EUI.
Energy consumption calculations and analysis
Finalize narrative and calculations showing compliance with Designing for Daylight.
Provide detailed LCC for equipment that use energy or water.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
188
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Provide final analysis of the concept's status with regard to P100 sustainable location standards,
incl. transit access and walkability.
Provide final narrative on site's relation to local planning context and how the proposed design
responds to local goals.
Highlight any outstanding uncertainties or opportunities that require further consultation or
analysis. Per P100, local regulations must be followed without exception in the design of
systems that have a direct impact on off-site terrain or infrastructure.
The concept package must clarify any relevant areas that have not yet resolved relevant issues.
Provide final zoning analysis. Describe status of local review and comment.
Provide additional details as appropriate to evaluate the concept.
For relevant interior assembly or other spaces, denote design strategy and estimated
occupancy capacities for various uses.
For exterior spaces, describe design strategy to support both passive and programmed uses,
including estimated site seating capacities.
All site strategies are clearly shown and identified within the drawings and further developed
from the second peer review stage with all peer review commentary responded to.
Update SITES scorecard showing enough points achievable to meet contracted requirement
and all possible points that require owner operational commitments are identified.
Narrative and drawing material required to achieve the preferred approach for SITES Credit 3.3-
for 6 points are prepared and submitted.
Draft materials required to achieve the preferred approach for SITES Credit 3.4 for 5 points..
Narrative and drawings with requisite calculations, including permeable and impermeable area,
number of parking stalls, number of trees required and proposed, and sustainable features
such as biofiltration areas, level spreaders, infiltration chambers, etc.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
189
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Taking building type and use into consideration, identify unique environmental conditions that
require improved system performance above the Baseline requirements (laboratories, storage
facilities, etc.).
Taking site and the risk of extreme weather into consideration, evaluate standing performance
criteria and adjust to ensure facility resilience.
Describe quantity, type(s), size(s), and complexity of proposed mock-ups.
Describe roofing type. Indicate roof slopes and drain locations.
Indicate type and extents of fall protection. Indicate means of safe suspended access.
Describe air barrier types.
Proposed insulation types and considerations
Compare design performance model to design EUI.
Proposed fenestration systems are appropriate to the climate
Proposed designs are readily achievable and do not pose unusual risks in terms of
constructability, performance, ease of maintenance or life cycle durability.
List any unique environmental/climate conditions that may impact proposed system.
Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life
cycle performance
Proposed enclosure systems are accessible for regular maintenance
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
190
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Continued development of selected concept.
Include demolition plans, floor plans showing: Work areas, lobbies, corridors, entrances,
stairways, elevators, special spaces, and service spaces (with the principal spaces labeled).
Dimensions for critical clearances, such as vehicle access, should be indicated.
Office areas must show proposed layouts down to the office level of detail.
Verify the integration between the approved program and the building concept is achievable, in
tabular form, including net, usable and gross SF
N/A
Drawing and narrative indicating plan for accessing and maintaining equipment, including
clearance requirements for maintenance, operation, and removal
Indicate distance and travel path from/to freight elevators and loading dock; include size &
weight of equipment.
Floorplans of all service spaces, including mailrooms loading dock
Provide analysis of loading dock in narrative format, along with any pertinent calculations.
Further refinement of narrative and calculations.
Including acoustical calculations for envelope, interior walls/floors/ceilings, mechanical and
electrical equipment. Heat transfer in building envelope, toilet fixture count,
illumination/daylighting/glare, elevator analysis, loading dock analysis
Further refinement of selected concept.
Floor plans, elevations showing fenestration, exterior materials, cast shadows
Interior elevations of major spaces, building sections showing adequate space for all systems
Color renderings, physical model to convey the architectural intent of the design
Compare net, usable and gross SF of design concepts to program.
Description of interior finish materials, with detailed explanation for public spaces
Identify millwork locations on plan.
Show proposed furniture locations on plan. Indicate ALL critical dimensions for ABAAS and
egress.
Section Continues (next page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
191
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
Floorplan showing open office and enclosed office area/layout & typical workstation design
intent
Office areas comply with GSA’s Space Utilization Benchmark and that the integration between
the approved program and the building concept is achievable (this is also dependent on the
tenant)
Interior conditions (noise, temperature, etc.) will contribute to occupant comfort at maximum
occupant load levels
Identify areas that require acoustical solutions. Provide acoustical solution concepts, i.e., sound
masking, ceiling treatments, and wall treatments.
Toilet fixture count analysis
N/A
Elevations of major building facades; List of exterior materials proposed (provide samples upon
request)
Color renderings showing major public spaces (as defined by PM at the start of the project)
from different vantage points
Electronic model of final concept
Code analysis
N/A
Section Continues (previous page)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
192
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Finalize narrative and update schematic plans.
Finalize narrative with recommended preferred foundation approach with supporting
information.
Show foundations on schematic plans.
Finalize narrative, prepare preliminary calculations and include information on schematic plans.
Finalize narrative and update schematic plans.
Update narrative and schematic plans.
Provide preliminary calculations verifying major member depths.
Final narrative
N/A
Final narrative
Update narrative and schematic plans, including FSL designation.
Provide preliminary calculations verifying size of forced protection structural elements.
Update narrative and schematic plans.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update narrative and schematic drawings.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
193
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Concept narrative to include:
Indoor and outdoor design conditions for all spaces under occupied, 24-hour, and unoccupied
conditions
Ventilation rates, dehumidification, and pressurization criteria for all spaces under occupied,
24-hour, and unoccupied conditions
Equipment capacities, weights, sizes, and power requirements
Description of heating, cooling, ventilating, and dehumidification systems for each major
functional space
Description of heating, cooling, ventilating, and dehumidification control strategies for each air
handling system under occupied, 24-hour, and unoccupied conditions
Fuel and utility requirements
Proposed system showing:
Extent of existing HVAC to be removed if applicable
Identification of spaces for mechanical equipment
Air flow riser diagrams representing supply, return, outside air, and exhaust systems
Water flow riser diagrams of the main mechanical systems
Preliminary building heating and cooling load calculations including U-value calculations, room
and zone inputs and summaries-
Preliminary indoor and outdoor design conditions for all spaces under occupied, 24-hour, and
unoccupied conditions
Preliminary ventilation rates, dehumidification, and pressurization criteria for all spaces under
occupied, 24-hour, and unoccupied conditions
Psychrometric calculations for HVAC systems at full load and partial loads. (Partial loads at 50%
and 25%, and unoccupied periods)
Water consumption calculations and analysis including make-up water for HVAC systems
Fuel consumption estimates
Table of contents identifying specifications to be used on the project
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
194
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Evaluation of alternate sources for preheating of domestic water (solar or heat recovery)
Update previous drawings to include:
Systems schematics and flow diagrams
Water Flow Riser diagrams of the main mechanical systems in the mechanical room(s) and
throughout the building
Water consumption calculations and analysis including domestic water and irrigation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
195
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Basis of design
Preliminary one-line for facility service entrance through to main switchgear/switchboard and
emergency/standby distribution
Further development of stacking, room sizes, equipment loading paths and locations of major
equipment
Approximate service size calculation + generators + onsite generation
Specifications Table of Contents (TOC)
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
196
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Narrative description of the building's proposed construction features, means of egress system,
water-based fire extinguishing systems, non water-based fire extinguishing systems, smoke
control systems, fire alarm and emergency communication system, fire service access elevators
(if applicable), occupant evacuation elevators (if applicable), etc.
Drawings Floor plans showing:
Equipment spaces for fire protection systems (fire pump, fire command center, etc.)
Fire protection water supplies, fire hydrant locations, fire apparatus access roads, and fire lanes
N/A
Code Analysis
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
197
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate- Executive Summary
Supporting Analysis- Basis of estimate, rationale, assumptions, and market analysis as required
in the P-120
Cost Plan Update- GSA Reports 3473, 3474
Cost Estimate- Summary Reports (ASTM UNIFORMAT II and CSI MasterFormat formats as
applicable)
Cost Estimate- Detail line item cost reports
Code Analysis
Cost Estimate- Provide separate estimates for phased work, or bid alternates/options
Demonstrate that the project is developing on-budget.
VM- List of cost-saving items that would collectively reduce the project cost to approximately
10% below budget
QC Review- Verify that the final concept can be constructed within the project budget.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
198
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Design is in keeping with GSA's design philosophy regarding Courtroom Spaces as laid out in
the U.S. Courts Design Guide and USMS Publication 64
Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects
in several vantage points
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
199
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
106 Compliance Preservation Report (iterative, as design develops-due with each submission)
Report, Narrative, Photographs and Drawings detailing building size, location, materials, design,
condition, and preservation design concepts.
See Design Guidelines for detailed information and more information on requirements.
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Concept Design: Final Concept (BA 51, 55, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
200
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
N/A
N/A
GSA P100 Submittal Matrix (2021) - Version 1.0
"- BIM Execution, COBie-Playbook & GSA-CDX information plan updated
- Native Design BIM
- IFC file exported from native Design BIM
- Updated COBie Spreadsheet (not final)
- BIM QC Checklist: Identifies what is currently contained in Design BIM
- BIM Interoperability Tool Model Check Report
- 3D Design Coordination Report
- Initial Detailed Energy BIM Model files (if required)
- Updated SDM data defined by the GSA CDX for all spaces/rooms."
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
201
ABAAS
Chapter 1
Narrative:
Include accessibility and ABAAS compliance, and synopsize issues.
Include commentary on any state or local code requirements that exceed the ABAAS. Describe
the accessible paths of travel and address any portion of the facility that will not be accessible
or fully compliant with the current ABBAS.
Address in detail any alterations that are technically infeasible or ABAAS exceptions employed
for qualified historic facilities.
Include documentation of technical assistance and approvals used to justify exceptions or
determinations of technically infeasible alterations.
Drawings – Include the following:
Site Plan: Graphic showing primary accessible path of travel and accessible route from site
drop off point and/or accessible parking stalls to primary accessible entrance to building.
Floor plans (or on enlarged room plans as appropriate) showing:
All elements of primary accessible path of travel (ie accessible bathrooms, drinking
fountains, telephones),
Accessible route
Door maneuvering clearances
Wheelchair clear floor, turning, and other key positioning spaces
Identify the public entrance with a powered door operator and any such doors within the
facility.
Elevations: Specific elements as they pertain to accessibility-(bathroom, kitchenettes/break
rooms, service counters, etc.)
Details: Include a sheet of general accessibility details as they pertain to the specific project
and reference all details to the appropriate code section and illustration.
Calculations:
Accessible parking spaces (including van spaces) and any type/use and dispersion
considerations affecting total number
Required accessible toilet/plumbing fixture counts
Accessible counters and seating as necessary
Additional elements and spaces covered by the ABAAS based on percentage such as storage,
dressing rooms, playground components, and so forth
Specifications:
Provide current references to the Architectural Barriers Act, ABAAS, and when necessary the
FM regulation sections implementing the ABAAS (§102-76.60 to §102-76.95).
Include specifications for all accessible elements including any specialty items and accessories.
Include in narrative all specification sections where accessible requirements are being used
and a brief description of its application within the specification.
Section Continues (next page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
202
BIM
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Native Design BIM
IFC file exported from native Design BIM
Updated COBie Spreadsheet (not final)
BIM QC Checklist: Identifies what is currently contained in Design BIM
BIM Interoperability Tool Model Check Report
3D Design Coordination Report
Initial Detailed Energy BIM Model files (if required)
Updated SDM data defined by the GSA CDX for all spaces/rooms
Submit revised statement to reflect development of design. If the POR is updated, then update
the statement to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Revised O&M Narrative to reflect development of design, and Design Development OE
Checklist
Provide clash model of equipment access and removal.
Description of how unique/tall architectural spaces will be maintained and cleaned (grand
staircases, atriums), how light fixtures will be changed, windows washed, etc.
Highlight relevant responses to previous submission comments.
Update the P100 matrix with any approved waivers.
Section Continues (previous page)
DBB
DB
DB Br
CMc
Update safety narrative including hazardous materials, fall protection, and arc flash
requirements. Show safety aspects in drawings.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
203
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
N/A
Updated LEED scorecard showing enough points expected to meet contractual requirement
N/A
N/A
N/A
N/A
Update Building Energy Model to compare to the design EUI.
Show coordination with other disciplines affected by Designing for Daylight.
Finalize LCC for equipment that use energy or water.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
204
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Site plan and drawings must reflect the pedestrian access and outdoor space usage strategy
described in the design concept and narrative.
Drawings must include pathway dimensions and materials intentions.
Narrative should reflect any needed coordination with local officials regarding relevant
sidewalk, property edge, curb cuts, and related elements.
For new construction projects, intention to replace public sidewalks should be clear.
Document results of local review and comment on design concepts compatibility with local
plans, zoning, and design guidelines.
Document results and any outstanding issues from local reviews.
Site/floor plans for outdoor/indoor public use spaces should be further refined, with materials
and product choices at or near final. Provide location and design of outdoor seating and other
site fixtures, with seating capacities of outdoor seating elements noted.
Full technical landscape and civil plan with enlargements that clearly show the design of the
proposed site including protection of existing critical site features; site demolition; site grading
and drainages; proposed site hardscape features including roadways, walking paths/circuits
and security tracks; site security elements including fence lines, bollard lines, and security
gates; life safety elements including emergency vehicle access; site water harvesting and
circulation systems; proposed site vegetation; on-site snow storage if applicable; and any
unique site design features that require critical coordination, pricing, and design concurrence.
Update SITES scorecard that clearly reflects the 100% DD design, identifies any items requiring
critical discipline coordination, items that require GSA and owner Agency approvals, and any
unique preliminary operational costs that are unique and need to be considered prior to further
design development.
Update final narrative and site diagram that identifies supportive technical drawings and
demonstrates clearly how the design achieves compliance with EISA section 438 and SITES
credit 3.3 for 6 points.
Update final narrative and site diagram needs to be submitted that identifies supportive
technical drawings and demonstrates clearly how the design achieves compliance with SITES
credit 3.4 for 5 points.
Final plan enlargement of the parking field design including all final calculations demonstrating
P100 compliance. Drawings should include:
Total parking stalls
Total required trees per parking area
Total proposed trees per parking area, and any elements that are in service to the overall
site hydrology goals including storm infiltration chambers, biofiltration areas, swales, etc.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
205
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Draft PRELIMINARY Building Enclosure Commissioning (BECx) Plan
Identify any testing required to address risk inherent in the design intent.
Describe mockup type(s) required to develop consensus for the design intent and/or prove
system performance.
Describe roofing type(s).
Indicate roof slopes and drain locations. Indicate type and extents of fall protection. Indicate
means of safe suspended access.
Indicate air barrier type(s).
In drawings, demonstrate that air barrier continuity and integrity can be achieved.
Indicate insulation type(s). In drawings, demonstrate that thermal barrier continuity can be
achieved.
Submit analyses demonstrating thermal performance and the control of moisture migration to
mitigate the risk of condensation.
Describe fenestration type(s). Identify products and systems to be specified.
Confirm compatibility of adjacent systems.
Evaluate the differential durability of materials and products to help extend the assembly life
cycle.
Submit analyses demonstrating thermal performance and the control of moisture migration to
mitigate the risk of condensation.
Describe approach to below-grade waterproofing.
In drawings, demonstrate that below-grade waterproofing continuity can be achieved.
Describe approaches to fall protection and safe suspended access.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
206
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
N/A
N/A
N/A
N/A
Detailed project narrative explaining the building design
N/A
Description of interior finishes, with detailed explanation for public spaces (samples provided
upon request). Provide preliminary finish schedule
Interior elevations showing millwork, provide millwork sections and details
All FF&E locations to be shown on plan. Provide table to identify if FF&E is provided by GC or
"other."
Section Continues (next page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
207
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
Acoustical calculations indicating noise transmission through the building envelope, interior
walls/floors (including raised floor)/ceilings, and mechanical/electrical equipment
Narrative discussing overall building floor efficiency
Toilet fixture count analysis
N/A
N/A
N/A
Provide reason for building massing.
Code analysis
Wayfinding signage plan
Section Continues (previous page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
208
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Update drawings.
Include special area load diagrams where appropriate.
Update drawings.
Provide preliminary foundation design calculations.
Update calculations, analysis and drawings.
Update drawings.
Meet w/ GSA structural engineer to review design.
Update drawings.
Update narrative.
Meet with GSA Structural Engineer to identify probable special inspection requirements.
Final narrative
Update drawings.
Update calculations and drawings.
MISCELLANEOUS
COMPONENTS
Chapter 4
Update drawings. Existing structures - identify concealed structural conditions that require
probes or testing, and any test results received to date.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
209
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Provide a dew point analysis
Updated equipment capacities, weights, sizes, proposed efficiencies, part load turndown
capabilities, and power requirements
A complete description of the air side and water side systems and the associated components
including operating characteristics, ranges, and capacities, spaces served, and special features
Descriptions of control strategy and sequence of operations for all spaces under occupied,
24-hour, and unoccupied conditions
A description of any deviation from the HVAC system as approved in the Final Concept
submittal, in accordance with P100
Approved system showing:
Extent of existing HVAC to be removed if applicable including equipment, ducts and pipes
Identify equipment access in enlarged plans
Single line piping and ductwork schematic layout including terminal units
Show all roof-mounted equipment and access to roof:
Show adequate access from mechanical equipment room(s) to freight elevators
Single line schematic flow and riser diagram(s):
Airflow quantities and balancing devices for all heating/cooling equipment
Water flow quantities and balancing devices for all heating/cooling equipment
Automatic control diagram(s):
Control flow diagrams showing all sensors, valves, and controllers (analog and digital)
Sequence of operations of all the systems for control sequences during occupied,
24-hour operations, and unoccupied conditions
Schedules:
Provide schedules of major equipment that includes chillers, boilers, pumps, air handling
units, and terminal units, cooling towers, and all equipment required for 24-hour
operations
Air terminal devices
Air balance relationships between spaces
Update previous calculations to include;
Updated water consumption calculations and analysis including make-up water for HVAC
systems, domestic water consumption, and water consumption for irrigation
Specifications with non relevant text shown as struck-through, but not removed
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
210
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Preliminary fixture type selections and GPF and GPM efficiencies proposed
Update previous drawings.
Update consumption calculations and analysis.
Specifications with non relevant text shown as struck-through, but not removed
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
211
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Final Basis of Design
Riser or one line diagram
Final MEP Space Allocations
Updated service size calculation + generators + onsite generation
Specifications Table of Contents (TOC)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
212
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
Narrative description of the building's:
Egress system description. Includes egress calculations and exit capacities, exit remoteness,
exit discharge, etc. Include interface with security system (where applicable)
Fire alarm and emergency communication description. Include interface with BAS and Security
systems (where applicable)
Water-based fire extinguishing system description
Smoke control system description (where applicable)
Fire service access elevator description (if applicable)
Occupant evacuation elevator description (if applicable)
Drawings:
Equipment spaces for fire protection systems (fire pump, fire command center, etc.)
Fire protection water supply lines, fire hydrant locations, fire apparatus access roads, fire lanes,
Etc.
Standpipe and sprinkler risers
Remoteness of exit stairs
Locations of fire walls, fire barriers, fire partitions, smoke barriers
Identification of occupancy type for every room and space
Identification of calculated occupant load for every room and space
Riser diagram for sprinkler system i. Riser diagram for fire alarm and emergency communication
system
Location of special fire protection requirements (e.g., kitchens, computer rooms, storage)
Calculations:
Occupant load and egress calculations
Fire protection water supply calculations, including water supply flow testing data
Fire pump calculations (where applicable)
Smoke control calculations (where applicable)
Code Analysis
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
213
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Project is viable from a cost standpoint
Supporting Analysis (Market, LCC, Risk, Sensitivity)
Cost Plan Update
Third Party Estimate
VM Report Implementation Validation
Reconcile AE/Third Party Estimate.
QC Review of Estimates
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
214
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
Specialty spaces with fixed seating, multi-level spaces, areas with sloped floors, and other
specialty spaces can be easily maintained
Describe cleaning, lamp replacement, and general care and maintenance of specialty spaces
(courtrooms, dining facilities, auditoriums, etc.).
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
215
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
SECTION 106 COMPLIANCE (51,55): New construction in a historic district or adjoining/affecting
historic property. Modernization involving major alterations to exterior or significant interior
spaces.
65% DD: 106 Compliance Preservation Report (iterative with each submission) - narrative,
photos, drawings explaining preservation design issues and proposed solutions. See Appendix
A for report template.
100% DD: 106 Compliance Preservation Report (iterative, as design develops, with each
submission): Provide documentation of adherence to building preservation plan and 106
agreement terms, as applicable.
106 Compliance Preservation Report (iterative, as design develops, with each submission):
Provide documentation of adherence to building preservation plan and 106 agreement terms,
as applicable.
Archeological compliance details-testing, discoveries, mitigation terms, as applicable
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
100% Design Development (BA 51, 54, 55, 61, 80, ESPC)
DD - 100%
CD - 65%
CD - 95%
CD - Final
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
Page
216
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Inclusion of details related to support of incorporation of AiA commision or Fine Art installation,
structural supports, lighting, etc.
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Native Design BIM
IFC file exported from native Design BIM
Updated COBie Spreadsheet
BIM QC Checklist: Identifies what is currently contained in Design BIM
BIM Interoperability Tool Model Check Report
3D Design Coordination Report
Updated Detailed Energy BIM Model files (if required)
Updated SDM data defined by the GSA CDX for all spaces/rooms.
Division 1 Specifications Sections on BIM tailored to project needs in construction phase
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
217
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Refine and revise submittal from DD phase as necessary. Note any revisions affecting
accessibility features and/or ABAAS compliance.
Where necessary, include state or local codes references where these exceed the ABAAS.
At all accessible details and features reference the codes sections these details are complying
with and reference the standard details in the included detail sheets.
Submit revised statement to reflect development of construction documents. If the POR is
updated, then update the statement to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Revised O&M Narrative to reflect development of construction drawings, and Construction
Documents OE Checklist.
N/A
Highlight relevant responses to previous submission comments.
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
218
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
N/A
N/A
N/A
N/A
N/A
N/A
Update Building Energy Model to compare to the design EUI.
Update calculations.
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
219
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
Update narrative and/site diagram.
Update narrative and/site diagram, paying special attention to any commitments or outstanding
issues related to local consultation.
Update narrative and/site diagram, paying special attention to any commitments or outstanding
issues related to local consultation.
Update narrative and/site diagram, paying special attention to any commitments or outstanding
issues related to local consultation.
Update full technical landscape plan and civil plan with critical enlargement plans.
All drawing schedules shall furnish complete and comprehensive information for each elements
of the landscape and site design, including pavement types and quantities, plant schedule
types and quantities (and compliance with pollinator requirements).
Update SITES scorecard that reflects the final design direction, identifies any items requiring
critical discipline coordination, items that require further GSA and owner Agency approvals, and
any unique preliminary operational costs that are unique and need to be considered prior to
further design development.
N/A
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
220
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Develop FINAL Building Enclosure Commissioning (BECx) Plan. Establish the types and
quantities of tests to be executed.
Describe mockup type(s) required to develop consensus for the design intent and/or prove
system performance.
Illustrate roofing assembly type(s).
In the wall sections and detail drawings that illustrate enclosure system assemblies, graphically
delineate air barrier continuity
Illustrate thermal barrier continuity.
Provide wall sections and detail drawings demonstrating the technical resolution of the design
intent.
In the wall sections and detail drawings that illustrate enclosure system assemblies, graphically
delineate below-grade waterproofing continuity
Illustrate approaches to fall protection and safe suspended access. Coordinate with other
disciplines including mechanical (equipment location) and structural as required.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
221
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
Demolition plan (if applicable); Floor plans; planning grids and raised access floor grid (if
applicable); reflected ceiling plans
N/A
N/A
N/A
Development of project calculations
N/A
Provide finish samples and wall and floor finish schedules.
Elevations to be provided, showing wall finishes such as ceramic tile, paneling, and acoustical
wall treatments.
Provide millwork finish samples.
Furniture plan, workstation typicals. Identify wall types and demountable wall locations
Section Continues (next page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
222
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
Final acoustical calculations, including noise transmission through envelope, interior walls,
floors and ceilings; mechanical and electrical equipment
Final toilet fixture count
Show building sections with vertical zoning for electrical and mechanical utilities.
N/A
N/A
N/A
N/A
N/A
Section Continues (previous page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
223
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Update drawings, calculations, analysis files & models.
Include loading diagram on drawings.
Update drawings.
Provide foundation details and construction notes.
Finalize foundation design calculations.
Update drawings, calculations, analysis files & models, specifications and any supporting
documents.
Update drawings, calculations or analysis.
Update drawings, calculations, analysis files & models, specifications and any supporting
documents.
Update drawings, calculations, analysis files & models.
Include loading diagram on drawings.
Update drawings, calculations, analysis files & models.
Include Special Inspection Program on drawings.
Update drawings
Update calculations and drawings.
Update drawings
MISCELLANEOUS
COMPONENTS
Chapter 4
Update calculations and drawings.
Existing structures - identify concealed structural conditions that require probes or testing, and
any test results received to date.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
224
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DBB
DB
DB Br
CMc
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative to include:
Final psychrometrics of HVAC systems
Cut sheets of selected equipment
"
Update previous calculations to include:
Final system pressure static analysis at peak and minimum block loads for occupied and
unoccupied conditions
Building pressurization analysis for peak and minimum block loads for occupied and
unoccupied conditions
Flow and head calculations for pumping systems for peak and minimum block loads for
occupied conditions
Acoustical calculations for peak and minimum block loads for occupied conditions
Sizing of vibration isolators for mechanical equipment
Sizing of fuel storage and distribution system
Update edited specifications
Update previous system to include:
Scope statement, concise but detailed, in General Notes & Legends sheet
Equipment access in enlarged plans, elevations, and cross-sections
Show all valves. Indicate locations where temperature, pressure, flow, contaminant/combustion
gases, or vibration gauges are required, and if remote sensing is required.
Double line drawings showing mechanical room piping and ductwork layout, damper locations,
piping and ductwork layout with terminal units
Location of automatic control sensors (e.g., temperature, relative humidity, CO2, room
pressurization)
Single line schematic flow and riser diagram(s). Show flow/energy measuring devices for water
and air systems for all cooling, heating, and terminal equipment, and their interface with the
BAS
Automatic control diagrams:
Control flow diagrams with sensors, valves, and controllers (analog and digital inputs for
controllers, front end equipment, and system architecture)
Show control signal interfaces, complete with sequence of operation of all heating,
ventilating, and cooling systems during occupied, 24-hour, and unoccupied conditions
Bill of Material Schedules:
Schedules of equipment that includes chillers, boilers, pumps, air handling units, terminal
units, cooling towers, indicate if furnished by owner, and all equipment required for
24-hour operations.
Air terminal devices
For major R&A project’s show existing equipment schedules or note as existing within
new schedules.
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
225
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DBB
DB
DB Br
CMc
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Update previous narrative
Update previous drawings to include:
Plumbing layout and fixtures, equipment and piping
Points of connection to existing, if required, and points of connection to new civil underground
utilities
Systems schematics and flow diagrams
Riser diagrams for waste and vent lines
Riser diagrams for domestic cold and hot water lines
Plumbing fixture schedule
Demolition plans showing points of disconnection, if required
Update consumption calculations and analysis to include:
Water consumption calculations and analysis for make-up water for HVAC systems and hot
water heating
Water supply calculations, including pressure
Roof drainage calculations
Sanitary waste sizing calculations
Update edited specifications
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
226
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Final Basis of Design
Updated riser or one line diagram.
Lighting, Receptacle & Electrical Equipment Layout
Updated Normal and Emergency Electrical Service Sizes
Specifications with preliminary editing
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
227
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
Fire protection drawing details (show all typical details on drawings)
Building Construction:
Construction Type
Fire walls, fire barriers, fire partitions, smoke barriers
Panel and curtain walls
Fire-stopping configurations. Include details of all openings between the exterior walls
(including panel, curtain, and spandrel walls) and floor slabs, openings in floors, and shaft
enclosures
Means of Egress:
Exits
Special locking arrangements
Exit Stairs-construction, landings, treads, guards and handrails, identification, path
markings
Discharge from exits
Water Supply:
Fire pump configuration
Anchorage of underground fire protection water supply line
Standpipe riser
Water-based fire extinguishing systems; All plans required in NFPA 13.
Non-water-based fire protection systems
Fire alarm and emergency communication systems; All documentation required in NFPA 72.
Fire service access elevators (if applicable)
Occupant evacuation elevators (if applicable)
Calculations
Final occupant load and egress calculations
Final fire protection water supply calculations, including water supply flow testing data
Final fire pump calculations (where applicable)
Final smoke control calculations (where applicable)
Fire modeling results, including input data and all pertinent material and assumptions required
to understand the output an analysis (where applicable)
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
228
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Project is viable from a cost standpoint
Supporting Analysis(Market, LCC, Risk, Sensitivity)
Cost Plan Update
QC Review AE Estimate
CMc Guaranteed Maximum Price
N/A
N/A
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
229
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
Assembly of visual and performance mock-ups
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
230
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Substantially complete contract documents adhering to 106 report and agreement terms
including
Pre Award submittal requirements for compliance with competency of restoration specialist
requirements
Technical specifications for treatment of historic materials
Specialized materials and procedures for repair and restoration
Procedures for protecting historic materials in areas being altered
Sample submittal requirements for replacement materials and new installations in preservation
zones
Sample review of repair and restoration procedures
106 Compliance Preservation Report (iterative, as design develops, with each submission):
Provide documentation of adherence to building preservation plan and 106 agreement terms,
as applicable.
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
65% Construction Documents: In Progress (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
231
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Inclusion of details related to support of incorporation of AiA commision or Fine Art installation,
structural supports, lighting, etc.
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
BIM Execution, COBie-Playbook & GSA-CDX information plan updated
Native Design BIM - compliant with BIMForum LOD 300 and LOI (GSA CDX) and BIM Modeling
Requirements
IFC file exported from native Design BIM
Updated COBie Spreadsheet - Contains all required components plus attribute data that is
generated during design
BIM QC Checklist: Identifies what is currently contained in Design BIM
BIM Interoperability Tool Model Check Report - showing compliance with all attributes required
by CDX
3D Design Coordination Report showing that all required systems to be coordinated have been
coordinated and do not interfere with each other
Updated SDM data/spaces defined by the GSA CDX for all spaces/rooms, correct areas for
ANSI/BOMA validation
Updated Detailed Energy BIM Model files (if required)
Updated Division 1 Specifications Sections on BIM
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
232
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
Revise and refine previous submittals as necessary to account for all accessibility goals and
ABAAS requirements.
Submit revised statement to reflect development of construction documents. If the POR is
updated, then update the statement to reflect relevant findings and changes.
Identify strategies and elements in the drawings and reference in the statement.
Revised O&M Narrative to reflect development of construction drawings, and Construction
Documents OE Checklist
Provide clash model of equipment access and removal.
N/A
Highlight relevant responses to previous submission comments.
Certification statement in drawings that the design meets applicable codes
Finalize safety aspects in drawings and specifications including OSHA construction safety plan
Certification statement that the design meets P100 and the performance tiers identified in the
P100 Performance Matrix
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
233
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
Update (as necessary) narrative detailing the integrated design process, the design's
sustainability strategy, and technologies that are expected to help achieve building
performance.
Identify sustainable design strategies on the drawings.
Updated LEED scorecard showing enough points expected to meet contractual requirement.
Any updates to renewable scope or equipment
Any updates to water net zero plans
Any updates to waste net zero plans
Update Guiding Principles Checklist if/as appropriate.
Update Building Energy Model to compare to the design EUI.
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
234
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
N/A
N/A
N/A
N/A
Continued coordination and refinements to the Construction Documentation coordination shall
be made, including close concurrence between specifications and drawings and final system
concurrence between professional disciplines.
All final drawing schedules shall be updated in preliminary final form for Agency review and
cost reconciliation.
All materials shall be clearly identified to reflect Agency guidance.
Preliminary final SITES scorecard with any coordination or critical items clearly identified.
Draft SITES submissions for the USGBC per area emphasis should be submitted to GSA for
review/concurrence.
Document results of preliminary consultation with the USGBC.
Draft SITE submission to comply with SITES credit 3.3 for 6 points.
Draft SITE submission to comply with SITES credit 3.4 for 5 points.
Preliminary final parking field design, with enlarged plans, including a schedule that identifies all
requisite trees, the spectrum of parking stalls required, final pedestrian circulation, final
measures being proposed to manage stormwater, and materials
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
235
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Specify BECx requirements.
In the drawings and specifications, establish requirements for the types, sizes, and complexity
of mock-ups. Coordinate requirements with the BECx Plan.
Detail and specify roofing assemblies.
Detail and specify air barriers.
Detail and specify thermal barriers.
Detail and specify fenestration systems. Resolve interfaces between different materials,
products, and assemblies.
Detail and specify below-grade waterproofing.
Detail and specify fall protection systems and provisions for safe suspended access.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
236
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
N/A
N/A
Diagrams illustrating proper clearance for servicing and replacement of equipment
N/A
Final detailed set of project calculations
N/A
N/A
N/A
N/A
Section Continues (next page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
237
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Section Continues (previous page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
238
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings. Provide statement/review by project geotechnical engineer that design
conforms to geotechnical report recommendations.
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations or analysis
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations, analysis files & models, specifications and any supporting
documents.
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final calculations and drawings
Final drawings
MISCELLANEOUS
COMPONENTS
Chapter 4
Final calculations and drawings
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
239
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Finalize previous narrative to include:
Final psychrometrics of HVAC systems
Cut sheets of selected equipment
"
Finalize previous calculations to include:
Final system pressure static analysis at peak and minimum block loads for occupied and
unoccupied conditions
Building pressurization analysis for peak and minimum block loads for occupied and
unoccupied conditions
Flow and head calculations for pumping systems for peak and minimum block loads for
occupied conditions
Acoustical calculations for peak and minimum block loads for occupied conditions
Sizing of vibration isolators for mechanical equipment
Sizing of fuel storage and distribution system
Final edited specifications
Finalize previous system to include:
Scope statement, concise but detailed, in General Notes & Legends sheet
Equipment access in enlarged plans, elevations, and cross-sections
Show all valves. Indicate locations where temperature, pressure, flow, contaminant/combustion
gases, or vibration gauges are required, and if remote sensing is required.
Double line drawings showing mechanical room piping and ductwork layout, damper locations,
piping and ductwork layout with terminal units
Location of automatic control sensors (e.g., temperature, relative humidity, CO2, room
pressurization)
Single line schematic flow and riser diagram(s). Show flow/energy measuring devices for water
and air systems for all cooling, heating, and terminal equipment, and their interface with the
BAS
Automatic control diagrams:
Control flow diagrams with sensors, valves, and controllers (analog and digital inputs for
controllers, front end equipment, and system architecture)
Show control signal interfaces, complete with sequence of operation of all heating,
ventilating, and cooling systems during occupied, 24-hour, and unoccupied conditions
Bill of Material Schedules:
Schedules of equipment that includes chillers, boilers, pumps, air handling units, terminal
units, cooling towers, indicate if furnished by owner, and all equipment required for
24-hour operations.
Air terminal devices
For major R&A project’s show existing equipment schedules or note as existing within
new schedules.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
240
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Finalize previous narrative
Finalize previous drawings to include:
Plumbing layout and fixtures, equipment and piping
Points of connection to existing, if required, and points of connection to new civil underground
utilities
Systems schematics and flow diagrams
Riser diagrams for waste and vent lines
Riser diagrams for domestic cold and hot water lines
Plumbing fixture schedule
Demolition plans showing points of disconnection, if required
Finalize consumption calculations and analysis to include:
Water consumption calculations and analysis for make-up water for HVAC systems and hot
water heating
Water supply calculations, including pressure
Roof drainage calculations
Sanitary waste sizing calculations
Final edited specifications
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
241
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Final basis of design
Final riser or one line diagram
Final lighting, receptacle & electrical equipment layout along with associated circuitry
Final normal/emergency electrical service sizes and point-by-point lighting calculations
Fully edited specifications
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
242
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
Fire protection drawing details (show all typical details on drawings):
Building Construction:
Construction Type
Fire walls, fire barriers, fire partitions, smoke barriers
Panel and curtain walls
Fire-stopping configurations. Include details of all openings between the exterior walls
(including panel, curtain, and spandrel walls) and floor slabs, openings in floors, and shaft
enclosures
Means of Egress:
Exits
Special locking arrangements
Exit Stairs-construction, landings, treads, guards and handrails, identification, path
markings
Discharge from exits
Water Supply:
Fire pump configuration
Anchorage of underground fire protection water supply line
Standpipe riser
Water-based fire extinguishing systems; All plans required in NFPA 13.
Non-water-based fire protection systems
Fire alarm and emergency communication systems; All documentation required in NFPA 72.
Fire service access elevators (if applicable)
Occupant evacuation elevators (if applicable)
Calculations:
Final occupant load and egress calculations
Final fire protection water supply calculations, including water supply flow testing data
Final fire pump calculations (where applicable)
Final smoke control calculations (where applicable)
Fire modeling results, including input data and all pertinent material and assumptions required
to understand the output an analysis (where applicable)
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
243
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Project is viable from a cost standpoint
Supporting Analysis(Market, LCC, Risk, Sensitivity)
Cost Plan Update
Third Party Estimate
VM Report Implementation Validation
Reconcile AE/IGE Estimates
QC Review AE Estimate
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
244
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
245
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Complete contract documents adhering to 106 report and agreement terms.
Detail drawings aligned with 106 compliance documents
Completed historic material specifications and contractor qualification requirements and as
shown for 65%
106 Compliance Preservation Report (iterative, as design develops, with each submission)
Provide documentation of adherence to building preservation plan and 106 agreement terms,
as applicable.
Archeological compliance requirements update reflecting results of design-phase testing, if
applicable
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
95% Construction Documents: Pre-Final (BA 51, 54, 55, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
246
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Inclusion of details related to support of incorporation of AiA commision or Fine Art installation,
structural supports, lighting, etc.
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
General Information
Discipline
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
247
ABAAS
Chapter 1
BUILDING OPERATIONS
& MAINTENANCE
Chapter 1
OPERATIONAL
EXCELLENCE
Chapter 1
CLIMATE ADAPTATION /
RESILIENCE
Chapter 1
BIM
Chapter 1
DESIGN COMMENTS
Chapter 1
P100 COMPLIANCE
Chapter 1
CODE AND SAFETY
Chapter 1
N/A
Certification statement signed and sealed by all applicable disciplines
Final O&M Narrative to reflect development of construction drawings, and Construction
Documents OE Checklist to the extent that CDs have changed
N/A
N/A
Certification statement signed and sealed by all applicable disciplines
Certification statement signed and sealed by all applicable disciplines
Final CD Native Design BIM to be archived and distributed to Contractor
Bidding model for procurement purposes / bidding release
IFC file exported from native Design BIM
Final CD COBie Spreadsheet to be distributed to Contractor
BIM QC Checklist: Identifies what is currently contained in Design BIM and confirms that it is
compliant with GSA BIM Standards for the Design BIM
BIM Interoperability Tool Model Check Report validating Model contains all CDX attributes and
appropriate design data
Final 3D Design Coordination Report
Final validated CD SDM data/spaces
Final Division 1 Specifications Sections on BIM
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
248
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
STRATEGY NARRATIVE
Chapter 1.7
ENERGY NET ZERO
Chapter 1.7.2
WATER NET ZERO
Chapter 1.7.2
WASTE NET ZERO
Chapter 1.7.2.1
ACHIEVABLE LEED
GOAL
Chapter 1.7.1
GUIDING PRINCIPLES
FOR FEDERAL
SUSTAINABLE
BUILDINGS
Chapter 1.7
DAYLIGHTING
Chapter 1
LIFE CYCLE COSTING
Chapter 1
ENERGY USE
TARGET/MODEL
Chapter 1.8
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
249
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SUSTAINABLE
LOCATIONS
Chapter 2
ZONING ANALYSIS
Chapter 2
DESIGN FOR PUBLIC
USE
Chapter 2
COLLABORATIVE
DESIGN PROCESS
Chapter 2
SITE / LANDSCAPE
STRATEGY
Chapter 2
STORMWATER
MANAGEMENT
Chapter 2
LANDSCAPE
IRRIGATION
Chapter 2
LANDSCAPE DESIGN
Chapter 2
SILVER CERTIFICATION
SITE APPROACH
Chapter 2
N/A
N/A
N/A
N/A
Final detailed set of drawings and specifications
Final SITES certification package. Submit to USGBC and GSA.
Final SITES certification package reflecting compliance with EISA section 438 and the
attainment of SITES credit 3.3 for 6 points
Final SITES certification package reflecting compliance with SITES credit 3.4 for 5 points
Final design reflecting compliance with the Parking Field design prescriptive requirements in
the P100 Facility Standard
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
250
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
ENCLOSURE
COMMISSIONING PLAN
Chapter 3
ROOFING / ROOF
DRAINAGE SYSTEM
Chapter 3
WHOLE BUILDING AIR
TIGHTNESS
Chapter 3
THERMAL BARRIERS
(INSULATION)
Chapter 3
VISUAL &
PERFORMANCE
MOCK-UPS
Chapter 3
FENESTRATION
(GLAZING SYSTEMS)
Chapter 3
OPERATIONS &
MAINTENANCE
Chapter 3
BELOW-GRADE
WATERPROOFING
Chapter 3
Specify BECx requirements.
In the drawings and specifications, establish requirements for the types, sizes, and complexity
of mock-ups.
Coordinate requirements with the BECx Plan.
Detail and specify roofing assemblies.
Detail and specify air barriers.
Detail and specify thermal barriers.
Detail and specify fenestration systems.
Resolve interfaces between different materials, products, and assemblies.
Detail and specify below-grade waterproofing.
Detail and specify fall protection systems and provisions for safe suspended access.
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
251
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
APPROVED PROGRAM &
ADJACENCIES
Chapter 3
MECHANICAL SPACES
Chapter 3
BUILDING & SERVICE
SPACES
Chapter 3
DESIGN NARRATIVE &
CALCULATIONS
Chapter 3
GENERAL
INFORMATION
Chapter 3
DESIGN CONCEPTS
Chapter 3
MILLWORK
Chapter 3
FURNITURE, FIXTURES
& EQUIPMENT
Chapter 3
FINISHES
Chapter 3
N/A
N/A
N/A
N/A
Final calculations and compliance reports (acoustical, heat transfer, toilet fixture count,
illumination/daylighting/glare analysis)
N/A
N/A
N/A
Final furniture package furniture typicals and specifications (if in A/E's scope)
Section Continues (next page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
252
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
OFFICE AREAS
Chapter 3
INTERIOR FACILITIES
Chapter 3
FLOOR-TO-FLOOR
HEIGHTS
Chapter 3
EXTERIOR DESIGN
Chapter 3
INTERIOR CONDITIONS
Chapter 3
INTERIOR DESIGN:
MAJOR PUBLIC SPACES
Chapter 3
ARCHITECTURAL CODE
COMPLIANCE
Chapter 3
SIGNAGE &
WAYFINDING
Chapter 3
BUILDING MASSING
Chapter 3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Section Continues (previous page)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
253
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
DESIGN LOADS
Chapter 4
VIBRATIONS
Chapter 4
INNOVATIVE METHODS
& MATERIALS
Chapter 4
STRUCTURAL SYSTEMS
Chapter 4
FOUNDATIONS &
GEOTECHNICAL
Chapter 4
STRUCTURAL ANALYSIS
& CALCULATIONS
Chapter 4
HISTORIC
CONSIDERATIONS
Chapter 4
PHYSICAL SECURITY
Chapter 4
CIVIL SITE
Chapter 4
QUALITY ASSURANCE &
SPECIAL INSPECTIONS
Chapter 4
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings. Provide statement/review by project geotechnical engineer that design
conforms to geotechnical report recommendations.
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations or analysis
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final drawings, calculations, analysis files & models, specifications and any supporting
documents
Final calculations and drawings
Final drawings
MISCELLANEOUS
COMPONENTS
Chapter 4
Final calculations and drawings
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
254
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
NARRATIVE
Chapter 5
ENERGY & WATER
ANALYSIS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Final narrative
Final drawings
Final calculations and analysis
Final edited specifications
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
255
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS & EQUIPMENT
Chapter 5
CALCULATIONS
Chapter 5
SPECIFICATIONS
Chapter 5
DRAWINGS
Chapter 5
Final narrative
Final drawings
Final calculations and analysis
Final edited specifications
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
256
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
BASIS OF DESIGN
Chapter 6
DRAWINGS
Chapter 6
CALCULATIONS
Chapter 6
SPECIFICATION
Chapter 6
ONE LINE
Chapter 6
Final basis of design
Final riser or one line diagram
Final lighting, receptacle & electrical equipment layout along with associated circuitry
Final normal/emergency electrical service sizes and point-by-point lighting calculations
Fully edited specifications
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
257
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SYSTEMS DESIGN
Chapter 7
CALCULATIONS
Chapter 7
CODE ANALYSIS
Chapter 7
DRAWINGS
Chapter 7
N/A
Calculations:
Final occupant load and egress calculations
Final fire protection water supply calculations, including water supply flow testing data
Final fire pump calculations (where applicable)
Final smoke control calculations (where applicable)
Fire modeling results, including input data and all pertinent material and assumptions required
to understand the output an analysis (where applicable)
N/A
Fire protection drawing details (show all typical details on drawings):
Building Construction:
Construction Type
Fire walls, fire barriers, fire partitions, smoke barriers
Panel and curtain walls
Fire-stopping configurations. Include details of all openings between the exterior walls
(including panel, curtain, and spandrel walls) and floor slabs, openings in floors, and shaft
enclosures
Means of Egress:
Exits
Special locking arrangements
Exit Stairs-construction, landings, treads, guards and handrails, identification, path
markings
Discharge from exits
Water Supply:
Fire pump configuration
Anchorage of underground fire protection water supply line
Standpipe riser
Water-based fire extinguishing systems (1) All plans required in NFPA 13.
Non-water-based fire protection systems
Fire alarm and emergency communication systems (1) All documentation required in NFPA 72.
Fire service access elevators (if applicable)
Occupant evacuation elevators (if applicable)
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
258
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COST VIABILITY
(Chapter, #, etc)
COST PLAN
(Chapter, #, etc)
COST ESTIMATE
(Chapter, #, etc)
COST ESTIMATE:
DETAIL
(Chapter, #, etc)
SUPPORTING COST
ANALYSIS
(Chapter, #, etc)
COST ESTIMATE:
CORE/SHELL, TI
(Chapter, #, etc)
PROJECT DEVELOPING
ON-BUDGET
(Chapter, #, etc)
QUALITY CONTROL
REVIEW
(Chapter, #, etc)
VALUE ENGINEERING
(Chapter, #, etc)
Cost Estimate
Project is viable from a cost standpoint
Supporting Analysis(Market, LCC, Risk, Sensitivity)
Cost Plan Update
Reconcile AE/IGE Estimates
QC Review of Estimate
N/A
N/A
N/A
N/A
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
259
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
COURTROOMS
Chapter 8
CUSTOMER DESIGN
GUIDE DEVIATIONS
Chapter 8
SPECIALTY SPACES
Chapter 8
N/A
N/A
List any exceptions or deviations from customer agency design guides such as US Courts
Design Guides and USMS Publication 64
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
260
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
General Information
SITE PRESERVATION
REQUIREMENTS
(Chapter, #, etc)
ARCHEOLOGICAL
CONDITIONS
(Chapter, #, etc)
DOCUMENT EXISTING
CONDITIONS
(Chapter, #, etc)
Complete contract documents adhering to 106 report and agreement terms including:
Pre Award submittal requirements for compliance with competency of restoration specialist
requirements
Technical specifications for treatment of historic materials
Specialized materials and procedures for repair and restoration
Procedures for protecting historic materials in areas being altered
Sample submittal requirements for replacement materials and new installations in preservation
zones
Sample review of repair and restoration procedures
Final 106 Compliance Preservation Report (iterative, as design develops, with each submission)
Provide documentation of adherence to building preservation plan and 106 agreement terms,
as applicable.
Archeological compliance requirements, including required monitoring or mitigation
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Construction Type
Project Phase
Discipline
Final Construction Documents: Issued for Construction (BA 51, 54, 55, 61, 80, ESPC)
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
261
General Information
Sustainability
Urban Development
Building Enclosure Systems
Architecture / Interiors
Structural
Mechanical
Plumbing
Electrical
Fire Protection
Cost Estimating
Specialty Spaces
Historic Preservation
Art in Architecture
ARCHITECTURAL
DESIGN VALUES
(Chapter, #, etc)
PROCESS
DOCUMENTATION
(Chapter, #, etc)
Final details related to support of incorporation of AiA commision or Fine Art installation,
structural supports, lighting, etc.
Summary of meetings with the Art in Architecture Panel
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0
Concept Design has unique
stages and requirements for
each of the four different
Construction Types.
Select the stage of interest
under the appropriate type in
the expanded menu to to the
left to navigate back to the
Concept Design requirements
section.
Or use the Construction Type
buttons at the top of the
sidebar menu to navigate
back to the appropriate
Delivery Phase Map.
4 - CMC
Preliminary Concept
Concept Development
Final Concept
Preliminary Concept
3 - DB Bridging
Concept Development
Final Concept
Offeror’s Tech Proposal
Pre-Award Concept
2 - DB
Post-Award Concept
Final Concept
Construction Type
Project Phase
1 - DBB
2 - DB
3 - DB Bridging
4 - CMC
1 - DBB
Preliminary Concept
Concept Development
Final Concept
Concept Design (all types)
DD - 100%
CD - 65%
CD - 95%
CD - Final
Page
262
DBB
DB
DB Br
CMc
GSA P100 Submittal Matrix (2021) - Version 1.0 GSA P100 Submittal Matrix (2021) - Version 1.0
This document is part of the Facilities Standards for the GSA Public
Buildings Service (P-100). The most recent version of this document
and its related counterparts can be found at:
http://www.gsa.gov/p100
Version Number: 1.0
Published: 2021
If you have any comments or feedback on this document, please
send them to: [email protected]
Submittal Matrix
REFERENCES
Photo Credit: Chipper Hatter, Courtesy of the Miller Hull Partnership